4
FORCE E
Installation, Operating & Service Manual
109444-03 - 12/19
2
Pre-installation
WARNING
Carefully read all instructions before installing
boiler. Failure to follow all instructions in proper
order can cause personal injury or death.
A. FORCE E boiler is Category I, draft hood
equipped appliance with vent damper.
B. Installation must conform to requirements of
authority having jurisdiction. In absence of
such requirements, installation must conform to
National Fuel Gas Code
, ANSI Z223.1/NFPA 54.
C. Appliance is design listed for installation on
combustible flooring and must not be installed on
carpeting.
D. Provide clearance between boiler jacket and
combustible material in accordance with authority
having jurisdiction. Minimum clearances outlined
in Figures 4-1 and 4-2.
E. Provide practical service clearances. Minimum
24" from left side and front jacket panels is
recommended for servicing.
F. Install on level floor. For basement installation
provide concrete base if floor is not level or if
water may be encountered on floor around boiler.
G. Protect gas ignition system components from
water (dripping, spraying, rain, etc.) during boiler
operation and service (circulator replacement,
condensate trap, control replacement, etc.).
H. Provide combustion and ventilation air in
accordance with the section
"Air for Combustion
and Ventilation,"
of the
National Fuel Gas Code
,
ANSI Z223.1/NFPA 54, or applicable provisions of
local building codes.
WARNING
Adequate combustion and ventilation air must
be provided to assure proper combustion and
dilution air.
I. Do not install boiler where gasoline or other
flammable vapors or liquids are stored. Avoid
areas near chemical products containing chlorine,
chloride based salts, chloro/fluorocarbons, paint
removers, cleaning solvent, and detergents.
J. Consider using boiler bypass described in
Section 6 "Water Piping" for systems which have
a large volume or excessive radiation where low
boiler water temperatures may be encountered.
K. Where required by authority having jurisdiction,
installation must conform to standard for Controls
and Safety Devices for Automatically Fired
Boilers, ANSI/ASME CSD-1.
L. A hot water boiler installed above radiation level
or as required by the authority having jurisdiction
must be provided with a low water cutoff device.
The Hydrostat 3200 LWCO is supplied with boiler.
!
!
Components Shipped with Boiler:
Vent damper
Circulator
Miscellaneous parts bag (Supply water manifold, Temperature/pressure gauge, 30 psi safety relief valve, drain
valve, circulator flanges)
IMPORTANT
This boiler is equipped with a feature that saves energy by reducing the boiler water temperature as the heating
load decreases. This feature is equipped with an override which is provided primarily to permit the use of an
external energy management system that serves the same function. THIS OVERRIDE MUST NOT BE USED
UNLESS AT LEAST ONE OF THE FOLLOWING CONDITIONS IS TRUE:
• An external energy management system is installed that reduces the boiler water temperature as the
heating load decreases.
• This boiler is not used for any space heating.
• This boiler is part of a modular or multiple boiler system having a total input of 300,000 BTU/hr or greater.
• This boiler is equipped with a tankless coil.