Page 14 sur 15
11. INSPECTION AND MAINTENANCE
In order to maintain the gates performances at its best,
Fontaine Aquanox
recommends the following
procedure.
11.1. INSPECTION FREQUENCY
Initial inspection: after 5 uses or two weeks after start up, whichever comes first.
Second inspection: 20 uses after the initial inspection or six months after start up, whichever comes first.
Subsequent inspections: Every 50 uses or every six months, whichever comes first.
If the stop plates or logs intensively or in extreme conditions, perform inspection every three months.
11.2. MAINTENANCE
Clean the plates and logs and their seals with clean water to get rid of any deposit.
Verify that the seals are in good condition
Verify that the guides are in good condition.