6
CONTEST
1. General information for fitters, maintenance technicians and users
pag.
4
1.1. General warnings
pag.
4
1.. Product conformity
pag. 5
2. Instructions for the user
pag.
7
.1 Control panel
pag. 7
. LCD
pag. 8
.3 BOILER STATUS - LCD ACTIVATION CORRESPONDENCE
pag. 9
.4 Operating the boiler
pag. 10
.4.1. Switching on
pag. 10
.4.. CH function
pag. 10
.4.3. DHW function
pag. 10
.4.4. ANTI-FREEZE FUNCTION
pag. 11
.4.5. PUMP AND THREE WAY VALVE ANTI-SEIZE FUNCTION
pag. 1
.4.6. External probe operation (optional equipment)
pag. 1
.5. Boiler lockout
pag. 13
.5.1. Burner lockout
pag. 13
.5.. Shut-down due to overheating
pag. 13
.5.3. Shut-down due to inadequate air/flue gas draught
pag. 13
.5.4. Shut-down due to incorrect fluid circulation
pag. 13
.5.5. Shut-down due to fan malfunction
pag. 14
.5.6. Alarm due to failure of temperature probes
pag. 14
.5.7 Flow alarm
pag. 14
.5.8. Alarm due to external probe malfunction
pag. 14
.6. Maintenance
pag. 14
.7. Notes for the user
pag. 14
3. Technical characteristics and dimensions
pag.
15
3.1. Technical characteristics
pag. 15
3.. Dimensions
pag. 16
3.3. Layout
pag. 17
3.4. Hydraulic layouts
pag. 18
3.5. Operating data
pag. 19
3.6. General characteristics
pag. 0
4. Instructions for the fitter
pag.
24
4.1. Reference standard
pag. 4
4.. System details
pag. 5
4..1. Central heating circuit
pag. 5
4... Filling the central heating system
pag. 5
4..3. Domestic hot water circuit
pag. 5
4.3. Site requirements
pag. 6
4.3.1. Choosing where to install the boiler
pag. 6
4.3.. Positioning the boiler
pag. 6
4.3.3. Boiler room ventilation
pag. 8
4.3.4. Flue
pag. 8
4.4. Installation (authorised personnel)
pag. 9
4.4.1. Packaging
pag. 9
4.4.. Installing the boiler
pag. 9
4.4.3. Gas main connection
pag. 30
4.4.4. Hydraulic connections
pag. 30
4.5. Flue options
pag. 3
4.5.1. Air intake/flue gas discharge system
pag. 3
4.5.. Air/flue gas system duct configuration
pag. 33
4.5.3. Ø 100/60 mm air/flue gas coaxial duct system
pag. 35
4.5.4. Ø 80 mm air/flue gas split duct system
pag. 36
4.5.5. Electrical supply connection
pag. 37
4.5.6. Selecting central heating output range
pag. 37
4.5.7. Room thermostat connection (optional equipment)
pag. 38
4.5.8. External temperature probe installation (optional equipment) and “sliding temperature” operation
pag. 38
4.5.9. Loading the system
pag. 40
5. Commissioning
pag.
41
5.1. Commissioning the boiler
pag. 41
5.. Setting the timer
pag. 41
5.3. Checking
pag. 41
5.4. Switching on and switching off
pag. 41
6. Maintenance
pag.
42
6.1. General warnings
pag. 4
6.. Boiler inspection
pag. 4
6.3. Combustion analysis
pag. 4
6.4. Testing combustion efficiency
pag. 43
6.5.1. “Chimney sweep” function
pag. 43
6.5.. Measurements
pag. 43
6.6. Wiring diagram
pag. 44
7. Spare part list
pag.
46
8. Troubleshooting
pag.
49
Summary of Contents for Tahiti Condensing 24 kW Combi (KC)
Page 46: ...46 7 Spare part list pic 33 KC model ...
Page 47: ...47 pic 34 KR model ...
Page 53: ...53 ...
Page 54: ...54 ...
Page 55: ......