8
self-contained
BIN • TOP-MOUNT
Ice transport tube
Install the ice transport tube.
5
• Install supplied ice transport tube insulation
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
➊
before making connection to ease assembly
• Connect ice transport tube to coupling on louvered docking station
➋
• Connect ice transport tube to shuttle actuator
➌
5.1
➊
➋
➌
Hot Water
160 F (71 C)
Summary of Contents for Horizon HMC1000ABT
Page 14: ...14 self contained BIN TOP MOUNT...