12
remote condensing
ICE MANAGER
Front cover
Install front cover to ice machine.
7
NOTICE
Ice machine MUST be sanitized prior to operation!
Consult Operation and Service Manual provided with ice machine for sanitizing instructions.
Install condensing unit
7.1
➋
➊
• Slide ice machine cover over machine
ensuring that tabs on back of cover
slip under louvers on back of louvered
docking assembly
➊
• Insert and tighten two screws through
cover and into louvered docking assembly
➋
Install ice machine front cover
7.2
• Complete installation of condensing unit
or connection to rack system.
• Required rack system capacity at 0 F
(-18 C) evaporator (EPR supplied by
installer).
1810N: 15,700 Btu/hr (3956 kcal/hr)
2110N: 18,200 Btu/hr (4586 kcal/hr)