22
HCC1010A/W, HCD1010A/W, HCC1410A/W, HCD1410A/W
Fig. 23
22. Install shuttle switch.
§
Align holes with pins
(Fig. 23.1) and depress switch
button
(Fig. 23.2) to clear shuttle tab.
Fig. 24
23. Install shuttle drain tube and front feed water tube
(Fig. 24) .
Fig. 25
24. Install main housing insulation and shuttle insulation:
25. Apply a coat of petro gel to auger shaft.
Summary of Contents for horizon elite HCC1010A/W
Page 16: ...16 HCC1010A W HCD1010A W HCC1410A W HCD1410A W Wiring diagram...
Page 36: ...36 HCC1010A W HCD1010A W HCC1410A W HCD1410A W Electrical box 1 7 4 3 2 6 5 13 11 8 9 12 10...
Page 40: ...40 HCC1010A W HCD1010A W HCC1410A W HCD1410A W Skins assembly 11 7 5 4 3 6 9 8 10 2 1 10...
Page 42: ...42 HCC1010A W HCD1010A W HCC1410A W HCD1410A W...
Page 43: ...HCC1010A W HCD1010A W HCC1410A W HCD1410A W 43...