background image

14

self-contained 

VISION • RIDE Technology

  •  Position plate into opening and secure 

with supplied screw

Power cord

7.11

  •  Remove twist tie
  •  Carefully pass cord thru opening and plug 

into wall outlet

  •  For H_E units, install a suitable plug

Power cord

7.10

  •  Connect cooling water lines to ice 

machine 

  •  Water valve is set at the factory. 

DO NOT 

remove seal or adjust water valve 

Cooling lines and power

7.9

CLEANER FULL

DRAIN CLOG

HIGH PRES

HIGH AMPS

SERVICE

MAINT/CLEAN

LOW WATER

TIME DELAY

SLEEP CYCLE

MAKING ICE

LOW BIN

POWER ON

CLEAN

TDS

HIGH

LOW

  •  Set the TDS switch on the electrical box:
  

HIGH: for extended service life

  

LOW: for low-scale water

TDS switch

7.12

Summary of Contents for Horizon Chewblet 1010 Series

Page 1: ...n Instructions for Vision HCD HMD710AVS HCC HMC HCE HME1010AVS HCC HMC HCE HME1410AVS HCC HMC HCE HME1010WVS HCC HMC HCE HME1410WVS See model number configurator on page 2 for details self contained 0...

Page 2: ...st type environments catering and similar non retail applications WARNING To avoid a hazard due to instability of the appliance it must be fixed in accordance with the instructions Configuration Appli...

Page 3: ...elf contained Front cover 8 Internal connection 7 Ice transport tube 5 External connection 6 Louvered docking assembly 4 Dispenser preparation 3 Site preparation 2 Unpack 1 Read and complete the follo...

Page 4: ...ained VISION RIDE Technology Carefully unpack and inspect the contents of your Follett ice machine 1 Unpack 7 16 7 16 DO NOT TILT ICE MACHINE TO ACCESS BOLTS COMPRESSOR DAMAGE WILL RESULT Unpack ice m...

Page 5: ...requires 15A dedicated circuit 1 50 mm2 wire H_E1410A W requires 20A dedicated circuit 4 00 mm2 wire Plug must be provided by end user must conform to standard EN 60 335 2 24 of the end destination P...

Page 6: ...Insert 16 609 6 mm of the long bin signal cable into the hole in the back of the louvered docking station and secure in place with strain relief provided After sliding the ice machine module into the...

Page 7: ...dge of cutout should be 2 25 57 mm from the left side of the ice machine Bottom edge of cutout should be 2 51 mm from the bottom of the ice machine Position supplied exhaust grille at least 18 458mm a...

Page 8: ...side of ice machine 3D Counter View 18 min 458mm 15 381 mm 24 min 610 mm 23 5 min 597 mm 31 min 787 mm 31 25 min 794 mm No Lip Undercounter installation detail CAUTION Keep ventilation openings in th...

Page 9: ...ps from forming For long tube runs see guide on page 19 Pitch tube at least 1 4 per foot 6 4mm 3m Ice transport tube must drain towards ice machine Ice transport tube to Ice machine Be sure tube ends...

Page 10: ...d of ice transport tube s Verify bin thermostat capillary tube is mounted correctly Front View VU155 Ice tube retainer bracket Front View VU300 thermostat thermostat thermostat ice tube retaining brac...

Page 11: ...icone tubing to the 3 4 barb Connect the 1 slip fitting to the 1 stand pipe drain Note Minimum 8 radius on silicone drain line Drain line from the ice machine must have at least 1 4 per foot pitch 6 4...

Page 12: ...emove twist tie Carefully pass cord thru opening and plug into wall outlet For H_E units install a suitable plug Power cord 7 3 Slide ice machine into louvered docking assembly ensuring that drain tub...

Page 13: ...uring that drain tube is fully seated on barbed drain fitting Insert ice transport tube into coupling and tighten nut firmly Ice transport tube 7 7 Water cooled ice machines follow steps 7 6 through 7...

Page 14: ...plug Power cord 7 10 Connect cooling water lines to ice machine Water valve is set at the factory DO NOT remove seal or adjust water valve Cooling lines and power 7 9 CLEANER FULL DRAIN CLOG HIGH PRE...

Page 15: ...two screws through cover and into louvered docking assembly For air cooled machines only install plastic grill Install front cover CAUTION Keep ventilation openings in the appliance enclosure clear o...

Page 16: ...vent dips or traps Long tube run recommendations 01113208R02 Follet LLC 4 18 801 Church Lane Easton PA 18040 USA Toll free 877 612 5086 1 610 252 7301 www follettice com Horizon Horizon Elite Maestro...

Reviews: