Page 1 of 20
Agora 850
Design Installation & Operating Manual v.2 EN
Tested by OMNI-Test Laboratories, Inc. and approved to
UL 737 standard – Omni report number: 304-F-06-2
US EPA exempt
-this document was packed with the appliance fire chamber-
TABLE OF CONTENTS:
1 – INTRODUCTION
2 – SPECIFICATIONS
a) Characteristics
b) Roof outlet requirement
c) Chimney requirement
d) Structural requirement
e) Connector
f ) Fresh air intake
g) Clearances to combustibles
3 – INSTALLATION
a) Included parts, materials and required tools for installation
b) Options
c) Assembly details
4 – OPERATING INSTRUCTIONS
a) Storage/use of flammable liquids
b) Grate
c) Ashes
d) Fuel
e) Before lighting your first fire
f) Building, starting and maintaining the fire
g) Protective glove
5 – MAINTENANCE
a) Taking out the ashes
b) Creosote formation and need for removal
c) Sweeping your chimney
d) Surfaces
e) Directions and reasons for cleaning glass
6 – WARRANTY