background image

INSTALLATION AND USER

INSTRUCTIONS

All instructions must be handed to user for safekeeping

Revision F - 05/10

Country(s) of destination - GB/IE

Focal Point Fires plc, Christchurch, Dorset BH23 2BT

Tel: 01202 499330     Fax: 01202 499326

www.focalpointfires.co.uk

e-mail: [email protected]

Excelsior

Slimline

Excelsior

Multiflue

Summary of Contents for Exselsior Multiflue

Page 1: ...anded to user for safekeeping Revision F 05 10 Country s of destination GB IE Focal Point Fires plc Christchurch Dorset BH23 2BT Tel 01202 499330 Fax 01202 499326 www focalpointfires co uk e mail sale...

Page 2: ...ed in a sufficiently ventilated space The appliance is designed for installation on to a non combustible hearth of at least 300mm depth This appliance is factory set for operation on the gas type and...

Page 3: ...are constructed from ceramic fibre Note Remote control models only This appliance features a battery operated remote control system and under normal usage will need new batteries approximately every t...

Page 4: ...in the flue apart from the one that the appliance is installed into and the one venting the gases into the air A suitable terminal may be fitted such as class GC1 as regulations allow This appliance h...

Page 5: ...must have a 50mm minimum clearance between it and the back wall of the opening or any other obstruction The area immediately above the outlet must form a smooth path into the flue Any type of fire su...

Page 6: ...inimum dimensions given in the diagram below are complied with Constructional Note The frame of the fire any back panel or other infill panels and the flue box must be sealed together so that there is...

Page 7: ...mer and fit the rubber grommet supplied A small incision can now be made in the rubber to slip snugly around the outside of the supply pipe and sleeving Note DO NOT install or use the appliance withou...

Page 8: ...ts ends The open end of the gas supply pipe should be temporarily sealed to prevent ingress of dust and dirt during installation CABLE FIXING Drill four holes as shown in the diagram and fit the fibre...

Page 9: ...irefront will clear the supply route If the data control plate is not already fitted attach with two screws ensuring the control knob is free to be depressed fully FUEL BED LAYOUT Coal effect option T...

Page 10: ...ebbles making sure that the flat sides are firmly against the brick panel and side cheeks as shown Note The pebbles must not be crammed together or inserted into the holes in the matrix A well laid ou...

Page 11: ...g the ignition procedure To turn the main burner OFF whilst keeping the pilot flame lit turn the ignition control knob to the pilot position then only the pilot will remain lit To shut the fire off co...

Page 12: ...If the initial spillage test fails run the fire for a further 10 minutes and repeat the test When the test has been complet ed satisfactorily repeat with any extractor fans in the premises running on...

Page 13: ...tive front and frame Remove the ceramics and the data control plate Remove the two screws securing the tray legs to the firebox Pull tray forward slightly and lift away Refitting is the reverse of abo...

Page 14: ...plate Missing grommet seal in firebox replace Fire does not spark at pilot HT lead detached refit Spark gap too large or small reset correctly Faulty piezo unit replace Debris shorting out electrode c...

Page 15: ...er details on clearances to combustibles No combustible material or flooring should protrude onto the hearth DO NOT burn any foreign material on this fire the coals pebbles must be of the correct type...

Page 16: ...the spark click to the PILOT light position ensuring the pilot has lit If not return the knob clockwise and repeat When the pilot lights after the spark keep the knob depressed for approximately ten s...

Page 17: ...is OFF and completely cold Debris that may form on the fuelbed should be periodically removed by a competent person Large deposits could indicate deterioration of the flue This should be repaired by...

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ......

Reviews: