FoamPRO MultiFlo Installation And Operation Manual Download Page 7

7

Installation and Operation Manual

MultiFlo

Figure 5. Flowmeter Placement

2. Locate a position on the apparatus operator’s panel

that will accommodate the FoamPro MultiFlo

Control Module. The cutout that will be needed in

the operator panel is a 3

7

8

" (98 mm) diameter hole

[the same as a 3

1

2

" (89 mm) pressure gauge].

The display is secured with four #10 socket head

screws in the four holes in the face (see Section 8

for a mounting template). The display requires

5 inches (127 mm) minimum from the back of the

operator panel to clear wires and connectors. Make

sure there is enough clearance behind the

operator’s panel for the cables.

To make sure proper readings are obtained, the

flowmeters require that the amount of water turbulence

in the pipe being monitored is as low as possible.

Excessive turbulence produces unstable and inaccurate

flow readings. The following installation guidelines will

help attain the best readings and maintain the accuracy

of the flowmeters.

A minimum

5 times the pipe diameter

of straight run

pipe without any fittings is necessary upstream of the

flowmeter (see Figure 5).

10 times

is even better - the

longer the straight run, the lower the turbulence. Here

are some examples of required straight run:

Pipe

Recommended

Size

Straight Run Pipe

1

1

2

" (38 mm)

7

1

2

to 15" (191 to 381mm)

2" (50 mm)

10 to 20" (254 to 508 mm)

2

1

2

" (64 mm)

12

1

2

to 25" (317 to 635mm)

3" (76 mm)

15 to 30" (381 to 762 mm)

The downstream plumbing of the flowmeter is not as

critical, but again, straight runs without fittings help

maintain accurate flow readings.

Do not mount a flowmeter directly after an elbow or

valve (see Figure 5). Valves create severe turbulence

when they are “gated-down.”

Figure 6. MultiFlo Control Module Grounding

NOTE: Make sure the panel where the control

module is mounted has an adequate ground.

For stainless steel and vinyl-coated panels, a

1⁄2" (13 mm) wide flat ground strap must be

attached from one of the four screws, holding

the control module in place, to the frame of the

fire truck to ensure adequate grounding (see

Figure 6).
CAUTION: Before connecting the molded

cables, inspect the yellow seal washer in the

female connector. If the seal washer is missing

or damaged, water can enter the connector and

cause corrosion of the pins and terminals that

will cause system failure.

Operator Panel

Lockwasher

Nut

Digital Display

#10 Screw

Flat Ground Strap

Summary of Contents for MultiFlo

Page 1: ...ly inspected and tested In order to maintain the high quality of your unit and to keep it in a ready condition it is important to follow the instructions on care and operation Proper use and good prev...

Page 2: ...OPERATION 13 6 DIAGNOSTIC PROCEDURES 14 7 PARTS IDENTIFICATION 15 8 INSTALLATION TEMPLATE 16 9 WARRANTY 20 NOTE TO SYSTEM INSTALLERS IMPORTANT Please provide a copy of the FoamPro manual to the end us...

Page 3: ...it Improper handling and forcing connections can damage these cables which could result in other system damage 1 Always disconnect the power source before attempting to service any part of the FoamPro...

Page 4: ...with foam concentrate by a single foam injection point Figure 1 FoamPro MultiFlo Control Module and Digital Display Control Module FoamPro MultiFlo Control Module Digital Display Control Module The F...

Page 5: ...ortioner being used For example If the FoamPro 2001 foam proportioning system is used the maximum foam concentrate flow will be 2 6 GPM 9 8 LPM When the foam concentrate injection is set to 0 1 the am...

Page 6: ...has five connectors on the back of the case see Figure 3 to connect the cables from the flowmeters and FoamPro Digital Display Control Module The FoamPro MultiFlo Control Module receives operating po...

Page 7: ...lowmeter see Figure 5 10 times is even better the longer the straight run the lower the turbulence Here are some examples of required straight run Pipe Recommended Size Straight Run Pipe 11 2 38 mm 71...

Page 8: ...mPro Digital Display Control Module Connect the cables from the flowmeter sensors to the connectors marked A B C or D on the back of the control module see Figure 3 If all connections are not used mak...

Page 9: ...aking round coils see Figure 8 Install clamp on beads at the locations indicated in Figure 7 Use a small amount of RTV silicone electrical tape or heat shrink tubing to keep the beads from moving afte...

Page 10: ...re 1 Remove the cover screw and the o ring to the left of the display readout panel on the MultiFlo Control 4 Calibration Procedures Module see Figure 9 Use a 3 32 allen wrench to remove the screw and...

Page 11: ...e cover screw and o ring to keep water and dirt from entering the control module as it can cause serious damage to the components Flow Method of Calibration The flow method of calibration is being use...

Page 12: ...dust from entering the control module 8 Proceed with the FoamPro foam proportioner system calibration per the applicable manual Total Volume Method of Calibration If a pitot gauge is not available th...

Page 13: ...l match is when water or foam solution is flowing through one paddlewheel flowmeter equipped discharge The FoamPro MultiFlo Control Module constantly monitors the flow signals from the flowmeter senso...

Page 14: ...control module display for any one of the paddlewheel flowmeters the flowmeter cable or flowmeter sensor could be defective and further diagnosis is required If no reading shows for any flowmeter the...

Page 15: ...ng 3 2660 0030 11 2 NPT Paddle Wheel Flowmeter Assembly Note 1 Bore 2660 0031 11 2 NPT Paddle Wheel Flowmeter Assembly 2660 0032 2 NPT Paddle Wheel Flowmeter Assembly 2660 0033 21 2 NPT Paddle Wheel F...

Page 16: ...ation and Operation Manual 8 4 25 2 75 4 25 78 3 50 3 70 10 24 x 44 DP 4 Holes Display requires a 3 875 inch 98mm diameter hole to be drilled in operator panel Additional space 3in 76mm required for c...

Page 17: ...1 2 8 NPT 3 Pipe 5 3 8 137 mm 4 9 16 116 mm 20 750 8 900 2600 0033B 2 1 2 11 BSP 3 Pipe 5 3 8 137 mm 4 9 16 116 mm 20 750 8 900 2660 0034 3 8 NPT 4 Pipe 5 1 2 140 mm 4 7 8 124 mm 30 1150 12 1380 2600...

Page 18: ...18 Installation and Operation Manual N O T E S...

Page 19: ...19 Installation and Operation Manual MultiFlo N O T E S...

Page 20: ...cts as above stated THERE ARE NO OTHER EXPRESS WARRANTIES ANY IMPLIED WARRANTIES INCLUDING IMPLIED WARRANTY OF MERCHANTABILITY OR OF FITNESS FOR A PARTICULAR PURPOSE ARE LIMITED IN DURATION TO ONE YEA...

Reviews: