![FNM HPE 110 Installation Manual Download Page 46](http://html1.mh-extra.com/html/fnm/hpe-110/hpe-110_installation-manual_2313270046.webp)
42 – FNM® Series HPE – Installation Manual
Prior to the sea trial eliminate the errors with the EDR.
When you first turn the engine control unit it can
have inside stored errors due to the
connection/disconnection of devices or sensors
during installation. Always clear any errors before
the first sea trial.
Save with the diagnosis software the following
parameters: RPM, LOAD, ENGINE TEMPERATURE and
COMPRESSOR PRESSURE. Record simultaneously with
an external tool the INTAKE AIR and the DISCHARGE
BACKPRESSURE .
While navigating, move the throttle load until reaching
every point included in the list of the "Sea trial" section,
then specify the parameters recorded by the EDR and by
the other instruments.
Also indicate the maximum performance obtained during
the trial.
7.
Complete the "Conclusions and approval" part in its
entirety, by inserting the comments in the "Notes" field. In
this phase, it is necessary to:
a.
Show the customer all the contents of this
handbook with the engine.
b.
Inform them of safety regulations.
c.
Explain the use of the engine.
d.
Inform the customer about the presence and
operation of the emergency stop button.
e.
Inform the customer about the control unit fuses.
f.
Explain the Limited Warranty terms.
g.
Inform the customer about his responsibilities.
h.
Sign and make the customer sign the document.
Place the installer stamp on the front part.
When the form is compiled, send it to CMD.