background image

 

For more information, visit www.desatech.com

2.

 

Chimney weight above offset rests on return elbow. 
Straps must be securely nailed to rafters or joists (see 
figure 9, details a & b). 

3.

 

Maximum length of pipe between supports (return elbow 
or 12S-8DM) is 6’ of angled run. Maximum of two (2) 6’ 
angled run sections per chimney system (see figure 11). 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
*For systems with 2 elbow sets, the minimum height is 22 ft. 
The maximum height for any system is 50 ft. 

FIRESTOP SPACERS: (V3600FS-8DM) 

Firestop spacers are required at each point where the chimney 
penetrates a floor space.  Their purpose is to establish and 
maintain the required clearance between the chimney and the 
combustible materials.  When the pipe passes through a 
framed opening into a living space above, the firestop must be 
placed onto the ceiling from below as shown in figure 12. 

 

PENETRATING THE ROOF: 

To maintain a 1-inch clearance to the pipe on a roof with a 
pitch, a rectangular opening must be cut. 

STEP 1:

 Determine the center point through which the pipe 

will penetrate the roof. 

STEP 2:

 Determine the center point of the roof. Pitch is the 

distance the floor drops over a given span, usually 12 inches. 
A 6/12 pitch means that the roof drops 6 inches for each 12 
inches one measure horizontally down the roof.  

STEP 3:

 Use the roof-opening chart (figure 13) below to 

determine the correct opening length and flashing required. 

STEP 4:

 Remove the shingles around the opening measured 

and cut out this section. 

STEP 5:

 Add the next sections of the pipe until the end 

penetrates the roofline.  Check to see that the proper 
clearances are maintained. Extend chimney by adding sections 
of double wall pipe until pipe is a minimum of 30 inches 
above the highest point of the roof cutout. Termination and 
chimney must extend a minimum of 36 inches above the 
highest point where it passes through roof. 

 
 
 
 
All joints between offset  
should be secured with two 
screws, only on the outer 
pipe, and shall not penetrate 
the inner stainless. 
 
 
 
 
 

Figure 10 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Figure 9 

 

Figure 11      *TYPICAL OFFSET INSTALLATIONS 

 

Figure 12 

 

PITCH

SLOPE

OPENING "A" MAX

USE FLASHING

(degrees)

(inches)

MODEL NO.

FLAT

0

15

V6F-8DM

0 - 6/12

26.6

16 - 1/8

V6F-8DM

6/12 - 12/12

45.0

20 - 3/8

V12F-8DM

 

 
Figure 13 

Summary of Contents for Baja II 36WIL

Page 1: ...pproved to ANS Z21 60 Z21 84 or RGA 2 72 standards or for use with a vent free gas log heater approved to ANS Z21 11 2 standard A DESA hood must be installed when using a vent free gas log heater see Accessories p 10 WARNING ALWAYS LEAVE GLASS DOORS FULLY OPENED OR FULLY CLOSED WHEN OPERATING THIS FIREPLACE SAVE THIS BOOK This book is valuable In addition to instructing you on how to install and m...

Page 2: ...5 HEARTH EXTENSION PG 3 6 OUTSIDE AIR KIT INSTALLATION PG 4 7 FAN KIT ASSEMBLY PG 4 8 CHIMNEY PIPE INSTALLATION PG 4 5 6 9 TERMINATIONS PG 6 10 FINISHING YOUR FIREPLACE PG 7 11 MANTELS PG 7 12 GLASS DOORS PG 7 13 GAS LINE INSTALLATIONS PG 8 14 CHIMNEY OFFSET PG 9 15 DAMPER OPERATION PG 10 16 TECHNICAL SERVICE PG 10 17 REPLACEMENT PARTS AND ACCESORIES PG 11 ...

Page 3: ...arances see page 7 Finishing your Fireplace Chimney Outer Pipe Surfaces 1 Min WARNING DO NOT PACK REQUIRED AIR SPACES WITH INSULATION OR OTHER MATERIALS MINIMUM MAXIMUM CHIMNEY HEIGHT The MINIMUM height of the chimney measured from the base of the fireplace to the flue gas outlet of the termination is 11 5 feet for straight flue or a flue with one elbow set The maximum distance between elbows is 2...

Page 4: ...r of non combustible inorganic material having a thermal conductivity of K 0 84 BTU IN FT HR F or less at 1 thick For example if the material selected has a K factor of 0 25 such as glass fiber the following formula would apply 0 25 0 84 x 1 0 0 30 thickness required Thermal conductivity K of materials can be obtained from the manufacturer or supplier of the non combustible material If the hearth ...

Page 5: ... flue pipe section with the hemmed end up Press down on each pipe section until the lances securely engage the hem on the fireplace starter The wire will assure the proper spacing between the inner and outer pipe sections Continue to assemble chimney sections as outlined above making sure that both the inner and outer pipe sections are locked together When installing double wall snap lock chimney ...

Page 6: ...hich the pipe will penetrate the roof STEP 2 Determine the center point of the roof Pitch is the distance the floor drops over a given span usually 12 inches A 6 12 pitch means that the roof drops 6 inches for each 12 inches one measure horizontally down the roof STEP 3 Use the roof opening chart figure 13 below to determine the correct opening length and flashing required STEP 4 Remove the shingl...

Page 7: ... any case refer to the installation instructions supplied with the termination The terminations approved for this fireplace are the RT 8DM and RTL 8DM that can be used for flashing or chase and ET 8DM ETO 8DM ETL 8DM and ETLO 8DM for chase style termination only Figure 16 shows an RTL 8DM round top termination Terminations with 16 slip pipe sections are available The RTT 8DM and RTTL 8DM are appro...

Page 8: ... the fireplace The clearances from the side of the fireplace to any combustible material and wall should fall within the limits shown in figure 20 Example 1 figure 20 The face of a mantel bookshelf etc is made of combustible materials and protrudes 2 from the wall the fireplace is installed in This combustible material must be a minimum of 4 from the side of the fireplace opening Example 2 figure ...

Page 9: ... gas line to wood framing to provide rigidity for threaded end STEP 4 Repack insulation around gas line and into sleeve opening Seal any gaps between gas line and refractory knockout hole with refractory cement or commercial furnace cement Install the gas appliance or cap off gas line if desired The gas pipe is intended for connection to an unvented vent free or a decorative gas appliance vented g...

Page 10: ...to lock it in place see figure 24 FOR FURTHER OPERATING GUIDELINES INSTRUCTIONS AND WARRANTY INFORMATION PLEASE REFER TO YOUR HOMEOWNERS GUIDE OR CONTACT YOUR AUTHORIZED DEALER TECHNICAL SERVICE You may have further questions about installation operations or troubleshooting If so contact The Technical Service Department at 1 888 427 8322 When calling have the model number of the fireplace ready Fi...

Page 11: ...For more information visit www desatech com 10 REPLACEMENT PARTS ACCESSORY PARTS ...

Reviews: