15
affiliated pulley beside the blade tray.
4. The new belt is tighter than the old. To assemble the new one is not as easily as to
remove the old. When you hold the belt into the slot, do not put your finger
between the pulley and belt, which may result in injury.
5. Replace the belt cover.
XI.
XI.
XI.
XI. Adjusting
Adjusting
Adjusting
Adjusting the
the
the
the hammer
hammer
hammer
hammer
There are 16 hammers in the machine box, when the blades are running fast, these
hammers will forceful hit the raw material constantly until crush them into small
pieces. As the machine working for a long time, the cutting edge of the hammer will
become blunt. Then, the operator needs to reinstall the hammers after overturning
them 18
0°
, let the blunt edge backward and the sharp edge forward.
When both sharp edges of one end of the hammer become blunt we can also replace
this end with the other end which is with sharp edges.
1. Turn off the engine before adjusting the hammer.
2. Open the side door of the outlet of discharge, remove the discharge screen.
3. Remove the board covering the blade.
4. Remove the upper hopper.
5. Wearing safety gloves; turn the hammer to the upper position of one axle.
6. Turn the axle of the hammer; remove the roll pin which is at the end of the axle.
There are four roll pins and make sure take all the roll pins out of the machine.
7. Place the axle of the hammer in the middle of the board covering the blade, then
pull out the axle.
8. Place the blunt edge of the hammer to the reverse and install them to the axle.
9. When adjust the hammer well, replace the roll pins.
10. Replace the upper hopper .
11. Replace the discharge screen .