Fluke 5514B-70M User Manual Download Page 8

P5514B-70M/P5514B-70M-EP

Users Manual

4

Operation

Priming

Follow these steps:
1. Open the reservoir valve one turn counter clockwise and turn screw press fully in.
2. Close the valve and turn screw press fully out.
3. Open the valve and turn screw, press fully in. 

Note

During this operation, bubbles can appear in the reservoir as trapped air is expelled. 

For large volumes, repeat steps 2 and 3 until no further bubbles appear.

4. With the valve open, turn screw press fully out and close valve. The test pump is now ready 

for use.

W

Warning

Turning the capstan out with the reservoir valve closed generates approximately 

15 inHg / 0.5 bar vacuum. If the DUT is vacuum sensitive, leave valve (13) open 

during priming operation.

Pressure Operation

Follow these steps:
1. Turn the screw press in to generate pressure.
2. Allow a few moments for the system to stabilize before taking any readings, especially after 

large changes in system pressure.

Note

Large, sudden changes in pressure will cause the system temperature to rise or fall, 

which can cause instrument readings to change as the fluid in the system expands or 

contracts, thus increasing or decreasing the pressure.

3. Use the fine adjustment control on the side of the manifold to make precise adjustments to 

the pressure. 

4. Compare the reading of the gauge under test with that of the master gauge.
5. For the next higher calibration point, repeat from Priming, step 1.
6. To measure reducing pressures, turn the screw press out (counter-clockwise).
7. Depressurize the system by turning the screw press FULLY OUT, then open the reservoir 

valve.

1.888.610.7664 

[email protected]

Fluke-Direct

.com

Summary of Contents for 5514B-70M

Page 1: ...ump Users Manual April 2021 English 2021 Fluke Corporation All rights reserved Specifications are subject to change without notice All product names are trademarks of their respective companies 1 888...

Page 2: ...ur nearest Fluke authorized service center to obtain return authorization information then send the product to that service center with a description of the difficulty postage and insurance prepaid FO...

Page 3: ...libration 1 Safety Information 1 Specifications 2 Operating Fluid Compatibility 2 DUT Connection 3 Operation 4 Priming 4 Pressure Operation 4 Ancillary Equipment 5 Pointer Remover Punch P5551 5 Master...

Page 4: ...ii P5514B 70M P5514B 70M EP Users Manual 1 888 610 7664 sales GlobalTestSupply com Fluke Direct com...

Page 5: ...is document refer to any pressure measuring instrument such as Transfer Standards Digital Calibrators and Transducers The Fluke 700G and 2700G Digital Test Gauges are recommended for this application...

Page 6: ...trument check the quality of the operating fluid during use If the fluid becomes discolored cloudy or particles appear in the reservoir drain and flush the system with clean fluid Pressure Range 70 MP...

Page 7: ...face of the device to be fitted is clean and undamaged as scratches or dents can form leak paths To connect the DUT 1 Select the appropriate adapter from the adapter set to match the thread on the DUT...

Page 8: ...ssure Operation Follow these steps 1 Turn the screw press in to generate pressure 2 Allow a few moments for the system to stabilize before taking any readings especially after large changes in system...

Page 9: ...can damage the sensitive instruments attached to the system Ancillary Equipment Pointer Remover Punch P5551 To remove and refit the pointer of a pressure gauge use the pointer remover punch instrument...

Page 10: ...s in Table 2 for detailed lists of available ranges and specifications Table 2 Gauges Figure 2 Fluke 700G Model Nominal Specification 700G See Figure 2 0 05 FS 700RG 0 04 Reading 0 01 FS 2700G 0 02 FS...

Reviews: