HDX USER INSTRUCTIONS ENGLISH 85392696 - 01/11
Page 3 of 60
INDEX
PAGE
Additional sources of information (10.3)............. 59
Alignment methods (4.5.2) ................................. 18
Assembly (6.9).................................................... 41
Associated equipment (2.4.1.5).......................... 12
Avoiding excessive surface temperatures(1.6.4.3)7
Bearings (5.7.3) .................................................. 32
CE marking and approvals (1.2)........................... 4
Certification (9) ................................................... 59
Change notes (10.2)........................................... 59
Commissioning, startup, operation (5)................ 23
Configurations (3.1) ............................................ 13
Consignment receipt and unpacking (2.1).......... 10
Copyright (1.4) ...................................................... 4
Design of major parts (3.3) ................................. 13
Direction of rotation (5.3) .................................... 30
Disassembly (6.7)............................................... 36
Discharge piping (4.6.3) ..................................... 21
Disclaimer (1.3)..................................................... 4
Dismantling of thrust bearing (6.7.2) .................. 37
Dismantling of line bearing (6.7.3)...................... 37
Disassembly of rotor (6.7.4) ............................... 38
Duty conditions (1.5)............................................. 4
Electrical connections (4.8) ................................ 22
Examination of parts (6.8) .................................. 38
Fastener torques (6.6) ........................................ 36
Faults; causes and remedies (7) ........................ 44
Foundation (4.3) ................................................. 15
Grouting (4.4)...................................................... 17
Guarding (5.4)..................................................... 31
Handling (2.2) ..................................................... 10
Hydraulic, mechanical and electrical duty (5.10).33
Initial alignment (4.5) .......................................... 18
Installation (4) ..................................................... 15
Introduction and safety (1).................................... 4
Inspection and maintenance (2.4.1.3) ................ 11
Lifting (2.3).......................................................... 10
Location (4.1)...................................................... 15
Long term storage (2.4.1) ................................... 11
Lubrication (5.1.1)............................................... 23
Maintenance to avoid the hazard (1.6.4.7)........... 8
Maintenance (6).................................................. 33
Maintenance schedule (6.2) ............................... 34
Marking (1.6.4.2)................................................... 7
Mechanical seals (6.8.3)..................................... 39
Nameplate and safety labels (1.7) ....................... 8
Noise level (1.9) ................................................... 9
Ordering of spares (6.3.1) .................................. 35
Other relevant documentation and manuals(10) 59
Parts list and Drawings (8) ................................. 46
Performance and operating limits (3.4).............. 14
Personnel qualification and training (1.6.2).......... 5
Piping (4.6) ......................................................... 20
Pressure and/or flow control (3.4.8) ................... 15
Preventing the build up of explosive mixtures
(1.6.4.4) ................................................................ 7
Preventing sparks (1.6.4.5) .................................. 8
Preventing leakage (1.6.4.6) ................................ 8
Products used in potentially explosive atmospheres
(1.6.4) ................................................................... 6
Protection systems (4.9) .................................... 22
Primary and auxiliary supplies (5.5) ................... 31
Pump description (3) .......................................... 13
Pumps with mechanical seals (4.6.5)................. 22
Recommended spares (6.4)............................... 35
Recycling and end of product life (2.5)............... 12
Routine inspection (daily/weekly) (6.2.1) ........... 34
Safety (1.6)........................................................... 5
Safety action (1.6.3) ............................................. 5
Safety labels (1.7.2) ............................................. 8
Scope of compliance (1.6.4.1) ............................. 6
Spare parts (6.3) ................................................ 35
Specific machine performance (1.8) .................... 8
Starting the pump (5.6) ...................................... 31
Stopping the pump (5.9)..................................... 33
Storage (2.4) ...................................................... 11
Storage of spares (6.3.2) ................................... 35
Suction piping (4.6.2) ......................................... 21
Summary of safety markings (1.6.1) .................... 5
Supplementary user instructions (10.1) ............. 59
Thermal control (3.4.7)....................................... 15
Tools required (6.5)............................................ 35
Transport and storage (2) .................................. 10