7 FAULTS; CAUSES AND REMEDIES

Insufficient flow rate
Irregular pump running
Driver overloaded
Mechanical seal leak
Equipment vibration
Excessive pump casing temperature

POSSIBLE CAUSES

SOLUTIONS

 

 

Pump or suction pipe not completely filled

- Check and complete filling

 

 

Air bubbles in pipes

- Check and deaerate the pipes

 

Suction level too low

- Check: the available NPSH > the required NPSH
- Reduce geometrical suction lift
- Reduce head losses in pipes and in fittings (diameter increase

and appropriate fitting positions)

- Check valves and strainers
- Check the immersion head of the suction valve

Wrong rotation

- Reverse 2 phases on motor terminal boxes

  

The motor is running on 2 phases only

- Check and control the motor electrical power supply

Motor running too low

- Check the connection in the terminal box according to the

voltage

Total manometric head system higher than
pump differential head

- Check the discharge head
- Check the head losses in discharge pipes (partly closed valve,

foreign particles, back pressure too high)

- Modify the installation or change the pump set

Total manometric head system lower than
pump differential head

- Throttle at discharge valve or trim the impeller (contact our

local agent)

 

Pipes (valves, filter...)

- Control, dismantle and clean

 

Insufficient flow rate

- Check the suction and discharge pipes (valves, back pressure)

Worn wear -ring surfaces

- Foresee pump mending: CONSULT FLOWSERVE

   

Seizure, jamming

- CONSULT FLOWSERVE

   

Excessive strains on flanges

- Check the flange connections and eliminate strains (pipe

positioning or elastic sleeves mounting)

Defective mechanical seal

- Check and replace all the mechanical seal parts
- Mechanical seal: CONSULT FLOWSERVE

   

Defective motor bearings

- CONSULT FLOWSERVE

Specific gravity or viscosity of liquid too high

- Consult our local agent to analyze the problem

Foundations not sufficiently rigid

- Check the setting of baseplates: tightening, bad adjustment,

seal

Insufficient pressure
Pump looses prime after starting

POSSIBLE CAUSES

SOLUTIONS

Rotation speed too low (check the driver)

- Check the connection in the terminal box according to the

voltage

 

Presence of air

- Check and deaerate

Suction pressure insufficient

- Check: the available NPSH > the required NPSH

Mechanical defects

- CONSULT FLOWSERVE

Air leak in the suction pipe

- Check suction pipe is airtight

Restriction in suction pipe

- Check diameter of suction pipe

Suction level too low

- Check the available NPSH > the required NPSH
- Reduce geometrical suction lift
- Reduce head losses in pipes and in fittings (diameter increase

and appropriate fitting positions)

- Check valves and strainers
- Check the immersion head of the suction valve

Obstruction of suction pipe

- Check condition of pipe

Defective gland packing on the shaft

- Check and replace all the gland packing
- Mechanical seal: CONSULT FLOWSERVE

Defective gasket

- CONSULT FLOWSERVE

Summary of Contents for 71576526

Page 1: ... stage centrifugal close coupled pump with an axial suction and a vertical axis discharge PCN 71576526 03 07 E Installation Operation Maintenance These instructions must be read prior to installing operating using and maintaining this equipment ...

Page 2: ... Piping 15 4 4 Electrical connections 17 4 5 Protection systems 18 5 COMMISSIONING START UP OPERATION AND SHUTDOWN 18 5 1 Direction of rotation 18 5 2 Guarding 18 5 3 Priming and auxiliary supplies 18 5 4 Starting the pump 19 5 5 Running the pump 19 5 6 Stopping and shutdown 21 5 7 Hydraulic mechanical and electrical duty 22 5 8 Pumps for Food Use or Potable Water 22 Page 6 MAINTENANCE 22 6 1 Gene...

Page 3: ...l duty 5 7 22 Inspection 6 2 2 and 6 2 3 24 Installation 4 15 Internal coating 6 2 6 25 Lifting 2 3 11 Location 4 1 15 Maintenance 6 22 Maintenance schedule 6 2 23 Mechanical seal 6 2 4 24 Nomenclature 3 2 12 Nameplate 1 7 1 8 Operating limits see 3 1 12 Ordering spare parts 6 3 1 25 Parts lists 8 2 29 Piping 4 3 15 Protection systems 4 5 18 Pump masses 2 2 2 10 Receipt and unpacking 2 1 10 Recomm...

Page 4: ...e applicable this document incorporates information relevant to these Directives and Approvals To confirm the Approvals applying and if the product is CE marked check the serial number plate markings and the Certification See section 9 Certification 1 3 Disclaimer Information in these User Instructions is believed to be reliable In spite of all the efforts of Flowserve Corporation to provide sound...

Page 5: ...s and health and safety personnel and follow all plant safety requirements and applicable safety and health laws and regulations 1 6 3 Safety action This is a summary of conditions and actions to prevent injury to personnel and damage to the environment and to equipment For products used in potentially explosive atmospheres section 1 6 4 also applies NEVER DO MAINTENANCE WORK WHEN THE UNIT IS CONN...

Page 6: ...ability and cavitation vibration 1 6 4 Products used in potentially explosive atmospheres The following instructions for pumps and pump units when installed in potentially explosive atmospheres must be followed to help ensure explosion protection The terminology and procedures ensure that the installed pump is in compliance with the European Directive 94 9 EC known as the ATEX Directive which is m...

Page 7: ...when the liquid temperature varies and the pump could be installed in different hazardous atmospheres In this case the user is responsible for ensuring that the pump surface temperature does not exceed that permitted in the particular hazardous atmosphere If an explosive atmosphere exists during the installation do not attempt to check the direction of rotation by starting the pump unfilled Even a...

Page 8: ... ancillary systems Where there is the potential hazard of a loss of a seal barrier fluid or external flush the fluid must be monitored If leakage of liquid to atmosphere can result in a hazard the installation of a liquid detection device is recommended 1 6 4 7 Maintenance to avoid the hazard CORRECT MAINTENANCE IS REQUIRED TO AVOID POTENTIAL HAZARDS WHICH GIVE A RISK OF EXPLOSION The responsibili...

Page 9: ...lowserve or a noise specialist if assistance is required in combining the values It is recommended that where exposure approaches the prescribed limit then site noise measurements should be made The values are in sound pressure level LpA at 1 m 3 3 ft from the machine for free field conditions over a reflecting plane For estimating sound power level LWA re 1 pW then add 17 dBA to the sound pressur...

Page 10: ...ctions concerning handling Boxes crates pallets or cartons may be unloaded using fork lift vehicles or slings dependent on their size and construction See 2 3 1 for positioning of slings To lift heavy pieces above 25 kg 55 lb use a winch adapted to the mass and in accordance with the current local regulations To lift machines or pieces with one or several suspension rings only use hooks and chains...

Page 11: ...parts the relevant materials and parts should be recycled or disposed of using an environmentally acceptable method and local regulations If the product contains substances which are harmful to the environment these should be removed and disposed of in accordance with current regulations This also includes the liquids and or gases in the seal system or other utilities Make sure that hazardous subs...

Page 12: ...lbm ft3 Density 1 Viscosity 1 mm2 s 31 SSU Frequency 50 Hz Maximum rotation speed 2850 min 1 1 If mechanical seal maximum temperature 80 C 176 F The maximum speed is shown on the pump nameplate 3 2 Nomenclature Characteristics shown on the nameplate fixed on the pump are as shown below Each pump is supplied with the following nameplate Each pump unit is supplied with the following nameplate Mass o...

Page 13: ...FM USER INSTRUCTIONS ENGLISH 71576526 03 07 Page 13 of 32 flowserve com 3 3 Coverage charts 3 3 1 2850 min 1 50 Hz Operating ranges Q H ...

Page 14: ...FM USER INSTRUCTIONS ENGLISH 71576526 03 07 Page 14 of 32 flowserve com ...

Page 15: ... frame level or on the discharge flange with a levelling instrument b Admissible defect 0 5 mm for 1 meter 0 02 in for 3 3 ft c Wedge under the pump Level Frame level 4 3 Piping The user must verify that the equipment is isolated from any external sources of vibration Protective covers are fitted to the pipe connections to prevent foreign bodies entering during transportation and installation Ensu...

Page 16: ...t 20 total angle b Arrange the piping so that there are no air pockets no bulges c If high points cannot be avoided in suction line provide them with air relief cocks d If a strainer is necessary its net area should be three or four times the area of the suction pipe e If an inlet valve is necessary choose a model with direct crossing Do not tighten flanges before the final check see 4 3 4 4 3 2 2...

Page 17: ...installing equipment on site Attention must be paid to ensure that the techniques used during wiring installation do not increase electromagnetic emissions or decrease the electromagnetic immunity of the equipment wiring or any connected devices If in doubt contact Flowserve for advice Before connecting the electric power supply if the device has been kept in a damp atmosphere have the insulation ...

Page 18: ...rotation exists the customer must install a reverse rotation protection device The customer must install all equipment required to avoid water hammer 5 COMMISSIONING START UP OPERATION AND SHUTDOWN These operations must only be carried out by qualified personnel 5 1 Direction of rotation Starting or operating pumps with the wrong direction of rotation can be harmful to the pumps Ensure that the pu...

Page 19: ...g d Check the direction of rotation of the motor Refer to the rotation arrow of the pump e DO NOT FORGET TO REMOUNT THE SHIELD GRID ON THE MOTOR STOOL f Open all inlet valves if existing g Close the outlet valve and the bypass valve h Ensure inlet pipe and pump casing are completely full of liquid 5 4 2 First pump start up Suction valves must be fully open when pump is running Never run the pump d...

Page 20: ... as this operation is completed 5 5 3 Pump fitted with a mechanical seal A mechanical seal ensures a seal without leakage and does not need any adjustment Nevertheless if a light leakage occurs during start up it should disappear after the initial running in of the friction faces 4213 4200 2445 4240 4610 With a mechanical seal the maximum temperature is limited to 80 C 176 F whatever the internal ...

Page 21: ...tem before commissioning Motor rating kW hp Maximum start ups per hour Up to 15 20 15 Between 15 20 and 90 120 10 90 120 to 150 200 6 Above 150 200 Refer Where duty and standby pumps are installed it is recommended that they are run alternately every week 5 6 Stopping and shutdown According to hydraulic conditions of the installation and its automation degree stop and restart procedures can have d...

Page 22: ...degradation It is important that NPSHA NPSHR The margin between NPSHA NPSHR should be as large as possible If any change in NPSHA is proposed ensure these margins are not significantly eroded Refer to the pump performance curve to determine exact requirements particularly if flow has changed If in doubt please consult your nearest Flowserve office for advice and details of the minimum allowable ma...

Page 23: ...eration b Any auxiliary systems installed must be monitored if necessary to ensure they function correctly c During cleaning of the pump ensure the compatibility between the cleaning products and the gaskets d Verify the condition of the gaskets e Gland packing must be adjusted correctly to give visible leakage and concentric alignment of the gland follower to prevent excessive temperature of the ...

Page 24: ...top the pump as soon as possible Have an approved seal vendor replace or repair the seal 4213 4200 2445 4240 4610 6 2 5 Gland packing 6 2 5 1 Pump fitted with a packed gland A well run in and correctly adjusted packing gland requires little maintenance If after some time the leakage becomes too great the gland should be tightened again in order to return these to a normal level If re tightening is...

Page 25: ...ering spares the following information should be quoted 1 Pump serial number 2 Pump size 3 Part name 4 Part number 5 Number of parts required The pump size and serial number are shown on the pump nameplate To ensure continued satisfactory operation replacement parts to the original design specification should be obtained from Flowserve Any change to the original design specification modification o...

Page 26: ...e Dismantle inlet and outlet pipeworks as well as all pipeworks f REMOVE PUMP TAKING INTO ACCOUNT SAFETY 1 AND HANDLING 2 2 PROCEDURES ANY DISASSEMBLY REPAIR OR REASSEMBLY WILL BE CARRIED OUT UNDER FLOWSERVE RESPONSABILITY EITHER DIRECTLY BY THE AFTER SALES SERVICE OR BY OTHER FLOWSERVE AGENTS WHO WILL GET THE REQUIRED INSTRUCTIONS AND APPROVALS THIS IS THE CASE OF AUTHORIZED REPAIRERS WHOSE ADDRE...

Page 27: ...k the suction and discharge pipes valves back pressure Worn wear ring surfaces Foresee pump mending CONSULT FLOWSERVE Seizure jamming CONSULT FLOWSERVE Excessive strains on flanges Check the flange connections and eliminate strains pipe positioning or elastic sleeves mounting Defective mechanical seal Check and replace all the mechanical seal parts Mechanical seal CONSULT FLOWSERVE Defective motor...

Page 28: ...FM USER INSTRUCTIONS ENGLISH 71576526 03 07 Page 28 of 32 flowserve com 8 PARTS LIST AND DRAWINGS 8 1 Sectional drawing ...

Page 29: ...e instructions where applicable Examples are certificates for CE marking ATEX marking etc If required copies of other certificates sent separately to the Purchaser should be obtained from the Purchaser for retention with these User Instructions 10 OTHER RELEVANT DOCUMENTATION AND MANUALS 10 1 Supplementary User Instructions manuals Supplementary instructions such as for a driver instrumentation co...

Page 30: ...FM USER INSTRUCTIONS ENGLISH 71576526 03 07 Page 30 of 32 flowserve com Nota ...

Page 31: ...FM USER INSTRUCTIONS ENGLISH 71576526 03 07 Page 31 of 32 flowserve com Nota ...

Page 32: ... Pacific Flowserve Pte Ltd 200 Pandan Loop 06 03 04 Pantech 21 Singapore 128388 Telephone 65 6775 3003 Fax 65 6779 4607 Local Flowserve factory representatives North America Flowserve Pump Division 5599 E Holmes Road Memphis TN 38118 USA Telephone 1 800 343 7867 Fax 1 901 259 3946 South America Flowserve do Brasil Ltda Av Don Helder Camara 5451 20771 001 Rio de Janerio Brasil Telephone 55 21 599 4...

Reviews: