background image

Step Two

COMPONENTS

Ultrasonic

AU13-4213

1 x LU10-1305
1 x LM45-1001
1 x LC10-1002

AU13-4217

1 x LU10-1325
1 x LM45-1061
1 x LC10-1052

AU13-5213

1 x LU10-2305
1 x LM45-5001
1 x LC10-1002

AU13-5217

1 x LU10-2325
1 x LM45-5061
1 x LC10-1052

Buoyancy

AV13-4213

1 x LV10-1301
1 x LM45-1001
1 x LC10-1002

AV13-4217

1 x LV10-1351
1 x LM45-1061
1 x LC10-1052

AV13-5213

1 x LV10-5301
1 x LM45-5001
1 x LC10-1002

AV13-5217

1 x LV10-5351
1 x LM45-5061
1 x LC10-1052

Vibration

AZ13-4213

1 x LZ12-1405
1 x LM45-1001
1 x LC10-1002

AZ13-4217

1 x LZ12-1425
1 x LM45-1061
1 x LC10-1052

Component List: 

A (Specify)

Switch Pak Fitting

P/N: LM45-1001, LM45-1061,

LM45-5001 or LM45-5061

Compact Relay Controller

P/N: LC10-1001, LC10-1051,

LC10-1002 or LC10-1052

Switch-Tek Level Switch

P/N: LU10-1305. LU10-1325,

LU10-2305, LU10-2325

LV10-1301, LV10-1351,
LV10-5301, LV10-5351, 

or LZ12-1405

A (Specify)

Ultrasonic

AU13-4223

1 x LU10-1305
1 x LM45-1001
1 x LC10-1001

AU13-4227

1 x LU10-1325
1 x LM45-1061
1 x LC10-1051

AU13-5223

1 x LU10-2305
1 x LM45-5001
1 x LC10-1001

AU13-5227

1 x LU10-2325
1 x LM45-5061
1 x LC10-1051

Buoyancy

AV13-4223

1 x LV10-1301
1 x LM45-1001
1 x LC10-1001

AV13-4227

1 x LV10-1351
1 x LM45-1061
1 x LC10-1051

AV13-5223

1 x LV10-5301
1 x LM45-5001
1 x LC10-1001

AV13-5227

1 x LV10-5351
1 x LM45-5061
1 x LC10-1051

Vibration

AZ13-4223

1 x LZ12-1405
1 x LM45-1001
1 x LC10-1001

AZ13-4227

1 x LZ12-1425
1 x LM45-1061
1 x LC10-1051

Strobe Alert Configuration:

(AU23-432_, AV23-432_ or AZ23-432_)

Standard Configuration:

(AU13-_22_, AV13-_21_ or AZ13-_21_)

3/4" NPT

(3/4" G)

2" NPT

(1-1/2" G)

Pipe

Socket

Pipe

Coupling

w/ 3/4"

Thread

Switch Pak Fitting includes
the following parts:

1 Fitting
1 Coupling
1 Customer specified pipe

Summary of Contents for Switch Pak A*13 series

Page 1: ...here is evidence of a potentially hazardous material present with product b The product has remained unclaimed at Flowline for longer than 30 days after dutifully requesting disposition of the product THERE ARE NO WARRANTIES WHICH EXTEND BEYOND THE DESCRIPTION ON THE FACE OF THIS WARRANTY This warranty and the obligations and liabilities of Flowline under it are exclusive and instead of and the or...

Page 2: ...0 psi 10 bar AV13 25 psi 1 7 bar Wetted material 42__ PP 52__ PVDF Kynar Process mount _2_3 2 NPT _2_7 1 1 2 G Enclosure rating NEMA 4X IP65 Installed height _21_ 6 5 16 5 cm _22_ 4 9 12 4 cm Encl material _21_ PP UL94VO and polycarbonate _22_ PP UL94VO Conduit entrance Single 1 2 NPT Classification General purpose CE compliance EN 50082 2 immunity EN 55011 emission EN 61010 1 safety Sensor Techno...

Page 3: ...evel Switch P N LU10 1305 LU10 1325 LU10 2305 LU10 2325 LV10 1301 LV10 1351 LV10 5301 LV10 5351 or LZ12 1405 A Specify Ultrasonic AU13 4223 1 x LU10 1305 1 x LM45 1001 1 x LC10 1001 AU13 4227 1 x LU10 1325 1 x LM45 1061 1 x LC10 1051 AU13 5223 1 x LU10 2305 1 x LM45 5001 1 x LC10 1001 AU13 5227 1 x LU10 2325 1 x LM45 5061 1 x LC10 1051 Buoyancy AV13 4223 1 x LV10 1301 1 x LM45 1001 1 x LC10 1001 A...

Page 4: ...al wiring of any liquid level control system should be performed in accordance with all applic able national state and local codes Take care not to cut or break the outer insulation jacket of wiring that may be immersed while routing cables in the Switch Pak system Such breaks of the liq uid seal of the sensor system may lead to component failure Flammable Explosive and Hazardous Applications The ...

Page 5: ...overed in the Installation section of the LC10 11 Series Manual Polarity neu tral and hot does not matter 4 Relay terminals NC C NO Connect the device you wish to control pump alarm etc to these terminals supply to the COM terminal and the device to the NO or NC terminal as required The switched device should be a noninductive load of not more than 10 amps for reactive loads the current must be de...

Page 6: ... is completely disconnected 2 Sensor Removal Make sure that the tank is in a state where it is safe to remove the sensors Carefully remove the Switch Pak from the installation 3 Cleaning the Sensor Use a soft bristle brush and mild deter gent carefully wash the Switch Pak Do not use harsh abra sives such as steel wool or sandpaper which might damage the surface sensor Do not use incompatible solve...

Reviews: