www.flowair.com |11
5.2 CONNECTING GUIDE
While connecting ELiS A dismount left side panel and left front panel, cables protract by glands.
5.3. CONTROL SYSTEM
5
Power supply 230V/50Hz;
Connectors for thermostat and fan step switch;
Door contact connector;
Valve actuator connector ELIS-..-W;
heaters contactor
connector ELiS-..-E;
BMS system connection;
T-box connectors;
MASTER-SLAVE connectors;
PT-1000 connectors;
LED INDICATORS:
G1, G2, G3
– signalize number of fan speed operating
S1, S2, S3
– signalize number of set fan speed
T
– signalize of valve set
DC
– signalize of door contact set
OPEN, CLOSE
– signalize valve actuator
WORK
– signalize of software working
SW3
– operating mode switch (default settings)
1
Device function
selection
BMS Address
adjustment
2
MASTER mode
operating
SLAVE mode
operating
3
Curtain
Heater (DUO)
4
ELiS-..-W/N
ELiS-..-E
5
K1 Programme*
K2 Programme**
6
Operating with
thermostat
Operating w/o
thermostat
*K1 programme
– Signal from door switch or thermostat is
main signal for the device to run
**K2 programme
– Signal from door switch is main signal for
the device to run and thermostat is in charge of valve/heaters