Universal Tool a Division of Florida Pneumatic Manufacturing Corporation
851 Jupiter Park Lane, Jupiter FL 33458
Installation
1
Cleaning the air hose
□
A 3/8" air hose is required, with a maximum length of 25 ft.
□
Clean the air hose of accumulated dust and moisture
before connecting it to the air supply.
NOTE:
If a longer air hose is required, connect a 1/2" air
hose to the 3/8" air hose to ensure the angle die grinder has
the necessary air supply.
Ensure the air line is shut-off and drained of air before removing this tool for service or changing sockets. This will prevent the tool from
operating if the throttle is accidentally engaged.
LUBRICATION
□
An in-line filter-regulator-lubricator is recommended as it increases tool life and keeps
the tool in sustained operation.
□
Regularly check and fill the in-line lubricator with air tool oil. Avoid using excessive
amounts of oil.
□
Adjust the in-line lubricator by placing a sheet of paper next to the tool’s exhaust ports
and holding the throttle open approximately 30 seconds. The lubricator is properly set when a light stain of oil collects on the paper.
□
If it is necessary to store the tool for an extended period of time (overnight, weekend, etc.), generously lubricate the tool through the air
inlet. Run the tool for approximately 30 seconds to ensure the oil is evenly distributed throughout the tool. Store the tool in a clean and
dry environment.
□
Recommended lubricants: Air tool oil or any other high grade turbine oil containing moisture absorbent, rust inhibitors, metal wetting
Maintenance
Recommended Air Line Set-Up
Part
Description
A
Air Tool
B
Quick Plug
C
Quick Coupler
D
Air Hose
E
In-line Regulator
F
In-line Lubricator
G
In-line Filter
H
Air Compressor