39
MT
GB
7 Mains lead
8 Housing interlock
9 On/Off switch
10 Handle
Installation manual
Scope of delivery
• Operating and safety instructions
• Shredder
• Chassis
• Collection bag
• Two wheels, wheel covers, and
mounting material
• Allen wrench
• Pusher
Assembling the shredder
B
Slide the axle (6.1) into the
chassis (6).
Mount the two wheels (5) onto
the chassis (6).
Slide the two wheels (5) onto
the chassis axle (6). Slip the
washers (12) onto the axle and
stick the split pins (14) through
the appropriate holes in the
axle.
Clip the wheel covers (11) onto
the wheels.
C
Place the shredder (14) on the
hopper (1). Push the chassis (6)
into the shredder.
Operation
Start-up
Check that the mains voltage
matches the rating on the name
plate.
Hook the collection bag (4) into the bag
mounts (3).
Switching the shredder on and
off
Make a loop at the end of
the extension cable and
hang the loop onto the
strain relief on the mains
cable (7).
Connect the extension cable.
Make sure that the funnel feeder is empty.
1. Set the On/Off switch (9) to turn on
the unit.
Place your chopping material in the fill
hopper. The material is drawn in and
chopped.
2. Set the On/Off switch (9) back to
“OFF” to turn off the unit.
The shredder will continue to run im-
mediately after switching off.
Emptying the collection bag
Avoid filling the collection bag too
much. Mind that the bag will une-
venly fill under the discharge duct!
1. Turn off the unit.
2. Remove and empty the collection bag
(4).