10
INSTALLATION (CONTINUED)
For Below Ground Installation
Install a valve box around the meter. Valve box extensions may be needed depending
on depth. (See Figure 7)
Note:
A minimum of 10 in. thick layer of gravel should be installed immediately below
the meter and valve box.
Figure 7
Wiring Connections
Below ground wiring connections require a waterproof splicing method to wire the meter
wires to the wire cable from the controller. The following splice sequence (Figure 8)
shows a
3M DBR/Y-6
splice kit used with 18 AWG wire cable from the controller. See
next page for splice instructions and wiring diagram.
Figure 8a Figure 8b
Figure 8c Figure 8d & 8e