background image

V SD-6 0 0 0  FRA M E  EX PL ODED  V I EW

21

2

4

4

2

3

1

1

5

15

16

6

6

7

7

8

9

10

11

12

79

14

28

29

27

31

33

44

45

46

45

49

49

55

79

54

79

80

61

41

18

58 80

61 73 80

73

60

80

73

61

80

73

60

80

60

61

73

66

69

69

69

66

103

101

102

105

104 20

107

22

22 106

98 80

98

80

80

98

43

32

65

108

15

17

54

13

27

27

5

23 109

24

79

55

55

79

55

68

68

35

25

26

34

42

SEE SHEET 2

SEE SHEET 2

SHEET 3 OF 12

80

1

58

1

80

60 73

80

73

60

1

69

32

43

30

32

43

1

1

80

61

69

44

65

49

30

57

59

30

57

16

59

79

71

89

71

53

54

80

55

58

58

58

58

80

80

80

80

58

58

63 64

Summary of Contents for VSD 6000

Page 1: ...ent Pending Assembly Instr uctions Manufactured by Floe International Inc 48473 State Hwy 65 McGregor MN www floeintl com UPDATED 4 04 05 P N 611 60055 01 SHEET 1 OF 12 TOOLSREQUIRED 2 9 16 SOCKETSOR...

Page 2: ...13 CRADLE CLAMP 1 75 1 1 LIFTING CABLE PULLEY CLEVIS 2 CLEAVIS SHEAVE 86 87 007 05068 00 007 07626 00 HHCS 3 4 16 x 2 ss 18 8 INCLUDES ITEMS 12 44 46 57 65 69 85 7500 6000 INNER SCREW LEG ASSEMBLY INC...

Page 3: ...3 61 80 73 60 80 60 61 73 66 69 69 69 66 103 101 102 105 104 20 107 22 22 106 98 80 98 80 80 98 43 32 65 108 15 17 54 13 27 27 5 23 109 24 79 55 55 79 55 68 68 35 25 26 34 42 SEE SHEET 2 SEE SHEET 2 S...

Page 4: ...FRAME EXPLODED VIEW 22 77 70 39 38 40 75 90 19 78 76 50 74 61 80 27 108 28 62 81 51 47 80 23 108 37 52 67 48 24 36 84 83 82 SHEET 4 OF 12 68 35 68 42 65 88 69 87 86 72 72 93 92 91 72 95 72 95 72 97 96...

Page 5: ...lbs See Fig 1A Arrange corner posts as shown to the right and in Fig 1B thru Fig 1E 1 2 x 5 Bolt 1 2 Aluminum Nylock Nut Fig 1B Fig 1C Fig 1D Fig 1E Fig 1A Fig 1A Fig 1B Fig 1C Fig 1D Fig 1E Right fro...

Page 6: ...bs The 108 side frame beams are attached using 4 1 2 x 4 bolts 8 flat washers and 4 aluminum nylock nuts on each beam See fig 2C For ease of assembly attach the 118 front and rear frame beams first La...

Page 7: ...the V brace clamps using 2 3 8 x 3 bolts and nylock nuts as shown in Fig 3B The frame can be squared to the corner post by adjusting the upper clamps up or down as necessary Once square torque bolts t...

Page 8: ...the end of the ball screw into the hole in corner post Insert the cable from the other end in the corner post slot and over the pulley Attach the cable end of the tube using 2 3 8 x 6 bolts and 2 3 8...

Page 9: ...astened together using 8 1 2 x 2 bolts and 8 1 2 nylock nuts Allow 1 4 gap between the side cradle and corner post as shown in Fig 5C Torque to 100 ft lbs Attach the lifting cable clevis to the cradle...

Page 10: ...attached to the upper clamp using a 1 2 x 2 bolt and nylock nut See Fig 6D The other side cable is attached to the upper clamp using a 1 2 x 2 bolt and nylock nut as shown in Fig 6E Torque both bolts...

Page 11: ...the receiver box must be installed Plug the wire into the radio remote plug on the control panel Using the supplied adhesive Velcro attach the box to the corner post or canopy frame with the antenna f...

Page 12: ...to the negative post of the other battery 1 To Drive Train Black Wire Battery Interconnect Wire 32 White Connect the 32 white battery interconnect wire to the negative post of the first battery and th...

Reviews: