background image

SHEET 5 OF 8 

STEP 2 

PLACE BUNKS ONTO UPRIGHTS (FIGURE 2.1) AND ATTACH USING (2) 3/8” X 2 3/4” BOLTS AND (2) 3/8” 
NUTS PER UPRIGHT (FIGURE 2.2).  

4X 

FIGURE 2.2

 

FIGURE 2.1

 

FIGURE 2.1

 

8X 

Reviews: