CC1W
Follow this guide to ensure the system is
properly installed and performing as intended.
Use the indicator lights to check performance,
making adjustments as needed.
Contact support hotline for advice.
Note
Mount the base unit in or near
the control box.
Secure the antenna as high as
possible by utilizing the
extension cable.
Orientate the antenna’s horizontal
edge to face the load cell.
Maintain line-of-sight, if possible.
Note
Mount the load cell, top plate and
washer set as recommended.
Position the front of the load cell
(Flintec logo) toward the base
unit.
Connect battery and seal the
door.
Use the indicator lights to verify
the system is working properly
INSTALLATION SUPPORT HOTLINE: (978) 333-7539
1
3
5
6
4
2
Mount the base
unit and antenna
Position the
antenna
Mount the
load cell and
rotate toward
base unit
Connect
the wires
Install the
battery
red
green
white
black
yellow
grey
violet
Vref+
Sig+
Sig-
Vref-
Shield
P
Position-
black
yellow
red
Ground
Shield
12 - 24VDC
Installation
Guide
Good signal (Off)
Poor signal (Yellow)
No signal (Red)
Data is being
transfered
(Blue /
red flashes)
Link quality
indicator
Comms indicator
Both transceivers
have power (Red)
Power indicator
power
signal
flintec.com
0099980 v1.0