24
K 2 . 1
13. First use
• Check that the control panel has been connected.
• Plug the unit into the mains supply.
• The unit will now start.
• The unit will automatically perform a start-up
procedure lasting approx. 2 min.
• After the start-up procedure the unit will follow the
settings entered on the control panel.
• If it is wished to check or alter the settings, this can be
done from the control panel.
(See separate documentation for automatic control.)
12. Final checks
Check that
• The duct insulation is in accordance with the manual
and the technical documents. It is very important the
GXFWVIURPWKHXQLWDUHDOVRHHFWLYHO\LQVXODWHGVR
that no condensation forms on or in the ducts. It is
especially important to check this if the ducts are to
be boxed in.
ȏ 'XFWVDUHFRQQHFWHGWRWKHULJKWQLSSOHVȂFKHFN
against the unit drawings below.
• Adjustments have been made in accordance with the
manual and project planning documents
(documentation of ventilation data).
• The unit operates normally at all stages.
• Heating switches in.
ȏ 7KHXQLWKDVȴOWHUVIRUERWKRXWGRRUDLUDQGH[WUDFW
air.
• Tumble dryers must not be connected to the unit.
CAUTION!
The installer may be
held liable for any incorrect or
defective installation.
i
514
227
371
84
129
229
514
227
371
84
129
229
(
6KRZQDVDULJKWKDQGPRGHO
(
6KRZQDVDOHIWKDQGPRGHO