RS70 manual GB 2009
www.flexiforce.com
22
manual
GB
rev.0 Feb-09
OPTIONAL: E-OPERATION
When you have selected an electrical
operator drive (LIFTMASTER LM60K/R or
other), then this should be assembled in
conformity with the handbook supplied
with this operator and above displayed
instructions. You should clearly follow the
instructions for electrical operation in this
handbook.
In order to maintain the closing peak force
of the door within the CE-standards the
attachment point of the drawbar should be
fixed at the proper position. Ask your
supplier for the correct position!
NB! The person installing the door must check thoroughly if the combination between this
door and the selected operator is safe to use (ITTR-approval report). Keep in mind the
max. peak force that is allowed when closing the door. People could get hurt if the
adjustment of the operator software, or the installation of the operator or the selected
operator on this door, are not checked correctly!!
So combinations:
RSV10 + RS70H30
RSV20
+
RS70H40
RSV30
+
RS70H50
RSV40
+
RS70H60
RSV50
+
RS70H60
RSV60
+
RS70H70
Min 120
Summary of Contents for RS70
Page 13: ...RS70 manual GB 2009 www flexiforce com 13 manual GB rev 0 Feb 09 PANEL HARDWARE INSTALLATION ...
Page 23: ...RS70 manual GB 2009 www flexiforce com 23 manual GB rev 0 Feb 09 OPTIONAL TANDEM ROLLERS ...
Page 25: ...RS70 manual GB 2009 www flexiforce com 25 manual GB rev 0 Feb 09 INSTALLING BOTTOM ALU SEAL ...