
—19—
Prior to splitting ensure:
• The Ply 130 is mounted properly (B-C).
• When using the Ply 130 in combination with the Ply Cart; always lock three
casters before starting to work with the Ply 130.
Release side guide and move to set to desired splitting depth. Setting is
performed in steps of 5 mm. Lock guide.
To prepare for a finger over finger splice the
material is separated between the plys . The
point of separation should be determined by the
operator since it will depend on belt material,
number of plys and desired splice.
The stepped pattern and fingers are created with
a finger punching tool after the separation.
i
D1
Separating for finger over finger Joints
D