background image

24

HOURS

 

HEURES

37

 SEAL THE SHOWER / 

CALFEUTRER LA DOUCHE

Summary of Contents for Apollo NABF4832-11-40L

Page 1: ...INSTRUCTION MANUAL GUIDE D INSTALLATION N014 10 2018...

Page 2: ...liser de poudre ou de tampon r curer ni d instrument tranchant sur les parties en m tal ou en verre De temps autre il suffit de nettoyer la porte avec une solution d eau et un d tergent doux pour cons...

Page 3: ...1 4 1 8 DRILL BITS M CHE 1 4 1 8 TOOLS REQUIRED OUTILS REQUIS MALLET MAILLET PENCIL CRAYON SCREWDRIVER TOURNEVIS LEVEL NIVEAU CUTTING PLIERS PINCE COUPANTE POSSIBLE CONFIGURATIONS CONFIGURATIONS POSS...

Page 4: ...PARTS LISTING LISTE DES PI CES 1 15 14 6 8 13 9 11 7 3 10 2 12 4 5...

Page 5: ...R HANDLE POIGN E DE PORTE 1 13 SIDE DOOR GASKET JOINT LAT RAL DE LA PORTE 1 14 WALL MOUNT BRACKET SUPPORT MURAL 1 15 RUNNING RAIL BARRE DE ROULEMENT 1 ITEM HARDWARE LISTING LISTE DE QUINCAILLERIE QTY...

Page 6: ...ONS QUENCE MODEL MOD LE MIN MAX MIN MAX 4832 45 3 4 116 cm 46 1 4 117 cm 29 7 8 76 cm 30 1 4 77 cm 6032 58 147 cm 58 1 2 148 cm 27 13 16 70 cm 28 3 16 71 cm MARK THE PLACEMENT LINE FOR THE RETURN PANE...

Page 7: ...N BE WELL FASTENED AND IS TOWARDS THE INSIDE OF THE SHOWER LE GUIDE INF RIEUR PEUT D PASSER LA BASE EN AUTANT QU IL PUISSE TRE BIEN FIX ET VERS L INT RIEUR DE LA DOUCHE SIDE VIEW VUE LAT RLE Edge of b...

Page 8: ...S JAMBAGES DRILL APPLY SILICONE INSERT WALL PLUGS PERCER APPLIQUER DU SILICONE INS RER LES CHEVILLES 6 18 THE HOLES ON THE SIDE OF THE WALL JAMB MUST FACE THE INTERIOR OF THE SHOWER LES TROUS SITU SUR...

Page 9: ...DD CLEAR SETTING BLOCKS 1 16 AJOUTER LES BLOCS DE NIVEAU TRANSPARENTS 1 16 DO NOT REMOVE THE TAPE FROM U CHANNELS NE PAS ENLEVER LE RUBAN DES PROFIL S EN U INTERIOR SHOWER SIDE INT RIEU R DE LA DOUCHE...

Page 10: ...E AFIN DE NE PAS GRAFIGNER LES PI CES EN ALUMINIUM 9 10 PLACE THE FIXED PANEL AND RETURN PANEL IN THE U CHANNELS PLACER LE PANNEAU FIXE ET PANNEAU DE RETOUR DANS LES PROFIL S EN U SECURE THE EXPANDERS...

Page 11: ...R SIDE INT RIEUR DE LA DOUCHE FRONT VIEW VUE DE FACE 3 14 26 23 12 INSTALL THE RUNNING RAIL ONTO THE FIXED PANEL INSTALLER LA BARRE DE ROULEMENT SUR UNIT INTERIOR SHOWER SIDE INT RIEUR DE LA DOUCHE Do...

Page 12: ...QUER L EMPLACEMENT DU SUPPORT MURAL SUR LE PANNEAU DE RETOUR AVEC DU RUBAN LEVEL AND MARK THE U CHANNEL AND BOTTOM GUIDE PLACEMENT NIVELER ET MARQUER L EMPLACEMENT DES PROFIL S EN ET GUIDE INF RIEUR I...

Page 13: ...ES PANNEAU FIXE ET PANNEAU DE RETOUR 16 REMOVE THE FASTENERS AND THE RUNNING RAIL ENLEVER LES FIXATIONS DE VERRE ET LA BARRE DE ROULEMENT 15 INTERIOR SHOWER SIDE INT RIEUR DE LA DOUCHE 24 23 15 SIDE V...

Page 14: ...IEUR DE LA DOUCHE DO NOT FORGET TO REPLACE THE CLEAR SETTING BLOCKS IN THE U CHANNEL NE PAS OUBLIER DE REPLACER LES BLOCS DE NIVEAU TRASPARENTS DANS LE PROFIL EN U DO NOT FORGET TO REPLACE THE CLEAR S...

Page 15: ...LAT RAL Door handle holes Trous de la poign e de porte INSTALL THE BOTTOM DOOR GASKET ONTO THE DOOR INSTALLER LE JOINT INF RIEUR SUR LE PANNEAU DE PORTE 20 2 11 2 11 19 SECURE THE BOTTOM GUIDE INSTALL...

Page 16: ...E INT RIEUR DE LA DOUCHE 2 21 INSTALL THE HANDLE ONTO THE DOOR INSTALLER LA POIGN E SUR LA PORTE TOP VIEW VUE DU HAUT INTERIOR SHOWER SIDE INT RIEUR DE LA DOUCHE 22 INSTALL THE SIDE GASKET ONTO THE DO...

Page 17: ...ACER LA PORTE SUR UNE SERVIETTE POUR VITER DE RAYER LA BASE DE DOUCHE PLACE DOOR INSIDE THE SHOWER PLACER LA PORTE L INT RIEUR DE LA DOUCHE A C INTERIOR SHOWER SIDE INT RIEUR DE LA DOUCHE B 23 INSTALL...

Page 18: ...L INSTALLER LE PANNEAU FIXE ET PANNEAU DE RETOUR INTERIOR SHOWER SIDE INT RIEUR DE LA DOUCHE INTERIOR SHOWER SIDE INT RIEUR DE LA DOUCHE 25 TIGHTEN THE WALL MOUNT BRACKET ON THE RETURN PANEL SERRER LE...

Page 19: ...IL AND LEVEL S CURISER SUPPORT MURAL SUR LA BARRE DE ROULEMENT ET NIVELER INSTALL THE RUNNING RAIL AND THE FASTENERS INSTALLER LA BARRE DE ROULEMENT ET LES FIXATIONS DE VERRE 27 23 INTERIOR SHOWER SID...

Page 20: ...RS AFTER SECURING THE EXPANDER RETIRER LE PINCE TAU APR S AVOIR S CURIS L EXTENSEUR INTERIOR SHOWER SIDE INT RIEUR DE LA DOUCHE 30 B INSTALL THE DOOR PANEL INSTALLER LE PANNEAU DE PORTE SIDE VIEW VUE...

Page 21: ...THE DOOR PANEL AND FIXED PANEL INSTALLER LES JOINTS LAT RAUX POUR LA PORTE ET LE PANNEAU FIXE TOP VIEW VUE DU HAUT 8 31 LEVEL TO ADJUST THE DOOR PANEL NIVELER POUR AJUSTER LE PANNEAU DE PORTE ADJUST...

Page 22: ...IDE INT RIEUR DE LA DOUCHE INTERIOR SHOWER SIDE INT RIEUR DE LA DOUCHE 34 INTERIOR SHOWER SIDE INT RIEUR DE LA DOUCHE SILICONE AROUND THE U CHANNELS INSIDE THE SHOWER CALFEULTRER L INT RIEUR DE LA DOU...

Page 23: ...clean cloth before installing threshold Essuyer la base avec un chiffon propre avant d installer le seuil Trim threshold according to door opening between wall and bottom guide as indicated Couper le...

Page 24: ...24 HOURS HEURES 37 SEAL THE SHOWER CALFEUTRER LA DOUCHE...

Reviews: