![FLETCHER Alfamacchine U500 Instruction Manual Download Page 44](http://html1.mh-extra.com/html/fletcher/alfamacchine-u500/alfamacchine-u500_instruction-manual_2303844044.webp)
TRANSLATION OF THE ORIGINAL INSTRUCTIONS (Keep for future reference)
Codice Documento
Rev.
Data di salvataggio
Data di stampa
U500 - U600 ISTRUZIONI
02
04/11/2015
04/11/2015
EN
40
Filling the magazine in the U500 model
In the U500 model, single magazine loading requires manual
activation of the PLV valve (A).
The V-nail detection sensor is not present, therefore the full
magazine signal is given by opening the PLV valve (A).
The “Magazine Empty” alarm signal is given by the V-Nail Counter.
Insert the V-Nails as follows:
1. Act on the PLV valve (A).
?!##`&#%!#%$#**\"%&<&%?**&"%&
and the V-nail pusher cylinder is opened.
3. Put the V-nails in the magazine (B), taking care to make sure
the sharp part (glue-edge side) is facing upwards.
4. Turn the PLV valve back to the initial position.
CAUTION!
Since the magazine in the U500 machine is not equipped
with a V-nail presence sensor, the empty magazine signal
%$#!"%!+%&!)##"!!)%!$!$&
#("!%$@!$($!$"&
Head replacement
NOTES
# 6799 ( & &
) 5 ; ,
# 6<996799 (
in the event of wear.
The measure
6799
corresponding to the size of the V-nail to be used
(C) 5-7-10-12-15, is stamped on the body of the U500 nailing head.
To replace the head, proceed as follows:
NOTES
&
6<996799 ,
&$>%??#<;&$>&%?}'*$""%&
the relative tool provided.
2. Remove the head from the support.
3. Insert the new head making sure it is aligned with the hammer
(E).
See the heading “HEAD ALIGNMENT”
A
B
C
U500
U600
E
D