background image

RE-ASSEMBLING THE CERAMICS AND FUEL BED

a)

Place the ribbed ceramic fuelbed base on top of the fuelbed support

and pull fully forwards to the burner.

Make sure that the fuelbed

base is located centrally in the fire box

.

Ensure that the fuelbed

base fit fully down onto the fuel bed support and is not

lodged on the burner. See fig. 1 below.

Fig. 1

b)

Position front ceramic rail on burner front ceramic support and ensure

that the locating channel in the front ceramic rail is correctly located

onto the lip on the burner front ceramic support. (See fig. 2 below)

Fig. 2

6

NOTE : The position of the fuel-bed components are critical to the

performance of the product. Therefore please ensure that the fuel-bed

components are positioned as described in the following section prior to

requesting a service call due to soot build up, poor flame pattern etc.

Summary of Contents for Linear Pebble FRDPU0MN

Page 1: ... EFFECT GAS FIRE User Instructions These instructions should be read by the user before operating the appliance and retained for future reference Model No s FRDPU0MN is for use on Natural Gas G20 at a supply pressure of 20 mbar in G B I E ...

Page 2: ...purpose made additional ventilation is normally required for this appliance when installed in G B When installed I E please consult document I S 813 1996 Domestic Gas Installation which is issued by the National Standards Authority of Ireland Any purpose made ventilation should be checked periodically to ensure that it is free from obstruction If the chimney or flue has been previously used by app...

Page 3: ...d conform to B S 8423 2002 Fireguards for use with gas heating appliances It is important that this appliance is serviced at least once a year by a CORGI reg istered gas installer and that during the service the fire is removed from the fire opening and the chimney or flue visually checked for fallen debris or blockages which must be removed The chimney should also be checked to ensure clearance o...

Page 4: ...he pilot goes out when the control knob is released repeat the lighting sequence In the unlikely event of a failure of the igniter the fire can be lit as follows Depress the control knob and turn anti clockwise to the position marked pilot Hold in the control knob for a few seconds to allow the gas to reach the pilot Insert the tip of a lit taper in behind the front ceramic pebble formation on the...

Page 5: ... is easily replaced by re positioning it on the fire and pushing it back onto the magnets Black painted metal parts should be gently cleaned with a damp cloth CLEANING THE LINEAR TRIM Abrasive cleaners chemical cleaning agents or any type of polish must never be used as damage to the finish of the Linear trim ashpan may result CLEANING THE FUEL BED We do not recommend cleaning of the pebbles or fu...

Page 6: ...r See fig 1 below Fig 1 b Position front ceramic rail on burner front ceramic support and ensure that the locating channel in the front ceramic rail is correctly located onto the lip on the burner front ceramic support See fig 2 below Fig 2 6 NOTE The position of the fuel bed components are critical to the performance of the product Therefore please ensure that the fuel bed components are position...

Page 7: ... s in the front ceramic rail as a guide for placement See fig 3 below Fig 3 d Select pebbles F to I and arrange behind the front row of pebbles ensuring that flame paths as indicated below are not interupted See fig 4 below Fig 4 7 Pebble A Pebble B Pebble C Pebble D Pebble E Pebble F Pebble G Pebble H Pebble I ...

Page 8: ...of the correct type Do not fit additional pebbles or any pebbles other than a genuine replacement set To ensure that the release of fibres from these R C F Refractory Ceramic Fibre articles is kept to a minimum during installation and servicing we recommend that you use a HEPA filtered vacuum to remove any dust accumulated in and around the appliance before and after working on the appliance When ...

Page 9: ... replaceable parts are as follows these are available from BFM Europe Ltd who may be contacted at the address shown below Pebble fuelbed base B 77260 Pebble fuelbed front rail B 58140 Replacement pebble set B 77250 This appliance must only be used with the Linear trim and ashpan cover supplied Due to our policy of continual improvement and development the exact accuracy of descriptions and illustr...

Reviews: