Supplied By www.heating spares.co Tel. 0161 620 6677
SECTION 2
INSTALLATION OF FIRE
2.1
UNPACKING THE FIRE
Carefully lift the fire out of the carton. Remove the loose item packaging carefully
from the front of the appliance. Check the contents as listed :-
Packing Check List
1off
Fire box / burner assembly
1off
Boxed ceramic base, ceramic front rails and 17 synthetic pebbles (9
large 8 small - grey and beige mixed)
1off
Loose items bag.
1off
Cable Fixing Kit
1off
StainlessTrim
1off each User instruction book and Installation book
2.2
INSTALLING THE FIRE BOX
Establish which type of flue you are intending to install the fire in to :-
225 x 225mm (9 inch x 9 inch) brick built chimneys
175mm (7 inch) diameter lined brick or stone flue, or insulated pre-fabricated
metal flue box to B.S. 715.
When installing into 125mm (5 inch) diameter lined brick or stone flue, or
insulated pre-fabricated metal flue box to B.S. 715 and pre-cast flues the
restrictor baffle must not be fitted.
A spillage test must always be carried out to check satisfactory
clearance of flue products, regardless of the type of flue the
appliance is being fitted to.
10