background image

3

Installation and maintenance instructions

FläktGroup 

DC_88842GB   20180328_R0

Specifications are subject to alteration without notice

General ECONET

®

 instructions can be found in ECONET

®

 manual 8750. 

This instruction only covers what is valid for the ECONET

®

 Exchanger 

Package.

UNPACKNING

Inspection of delivered equipment
–   Check for signs of transit damage.
–   Check that the product codes on the rating labels conform to your  
 requirements.
–   Check the delivered components against the bill of material.
–   The code for the ECONET

®

 Exchanger Package can be found on  

  one of the heat exchangers.

INSTALLATION INSTRUCTION

The following shall be carried out on site by the plumbing/automation 
and electrical contractors.

–   Installation of necessary components for connecting an external  
  energy source, as set out in the documen-tation.
–   Filling and air purging of system.
–  Equipment and controls for supplementary heating and cooling  
  (SV30, SV50).

= Pipe connection: ECONET

®

= Pipe connection: Exchanger package

EQRZ-05 and
LQRZ-05 ECONET

®

Exchanger Package

PIPE INSTALLATION

–  Installation of pipes between the ECONET

®

 Exchanger Package and  

  the Econet

®

 pump unit.

–  Installation of the piping from the external energy source.
–  Filling and air purging of the Econet

®

 circuit and the external water  

 system.

Reviews: