background image

8 | 

P a g e

 

 

Sample installation drawing with bypass line 

 

FHD-70 to FHD-120   

 

Summary of Contents for Green Fuel Catalyst FHD-120

Page 1: ...Patented Fitch fuel catalyst technology INSTALLATION MANUAL FUEL CATALYST FHD 70 TO FHD 120 FOR MARINE SYSTEMS Made in USA...

Page 2: ...FHD 70 TO FHD 120 SERIES SAMPLE DRAWING 6 Models FHD 70 to FHD 120 6 INSTALLATION 7 Receiving instructions 7 Installation 7 Start up of catalyst 7 Sample installation drawing with bypass line 8 OPERA...

Page 3: ...d is to have a few hand tools and close following to the instruction manual guide However it is essential to do the installation carefully and safely We recommend that you read the next few lines with...

Page 4: ...fore opening the lid Bolt housing to flor as tipping may occur when lid is open The catalyst unit if improperly used can cause serious injury or death Ignoring safety rules risks creating a hazard to...

Page 5: ...ctured with the highest quality materials and with greatest pride to offer you a superior in line housing for marine applications Features Specs 12 GA cold rolled steel Viton O ring seal 2 NPT Inlet a...

Page 6: ...IES SAMPLE DRAWING Models FHD 70 to FHD 120 Models FHD 70 to FHD 120 have the same dimensions see the drawing below The only difference between them is in their weight which is due to the actual catal...

Page 7: ...unit from the system when cartridge replacement is necessary Tighten housing with proper tension to seal housing on existing pipe or flange Note housing has been factory pressure tested to assure a le...

Page 8: ...8 P a g e Sample installation drawing with bypass line FHD 70 to FHD 120...

Page 9: ...carefully inspected for signs of damage or deterioration each time the housing is opened We recommend the gasket to be lubricated with petroleum jelly prior to installation Catalyst unit has no moving...

Page 10: ...lp to remove caked on debris Rinse the housing and unit cover with a clean solvent and dry with soft lint free wiping cloths 6 Lightly lubricate the head gasket with vaseline or petroleum jelly and po...

Page 11: ...e See Chapter Core Cleaning Procedures See Chapter Core Cleaning Procedures See Chapter Core Cleaning Procedures See Chapter Core Cleaning Procedures See Chapter Core Cleaning Procedures See Chapter C...

Page 12: ...e Quarterly Catalyst shall be visually checked quarterly and any irregularities or deficiencies shall be followed up and be reported to the responsible engineer The checks shall be performed visually...

Page 13: ...s please contact your local distributor Any variations from these instructions should also be pre approved by manufacturer www greenfuelcatalyst com info greenfuelcatalyst com Copyright 2019 Green Fue...

Reviews: