background image

R

PANEL PREPARATION INSTRUCTIONS

STEP 7:

  FITTING THE PANELS TO THE PRODUCT

6

Fit the assembled Panels by sliding in an inwards and upwards motion. 
The rubber seal between the Drawer and Panels must be kept in place.

Secure the Panels by inserting the pins on either side of 
the Drawer.  Be sure that the rib on the pin is vertical.

NOTE: Do not fit the Toe Kick Panel (or supplied Black 
Prefinished Toe Kick) to the 

R

 until the Product is in 

the cavity. 

Important!

The gap between doors must be 

5

/

16

” 

(

8mm) or drying problems and 

moisture damage may occur. 

INTEGRATED PANEL PREPARATION IS COMPLETE. 

The Product is now ready to install.  Refer to Product Installation 
Instruction Sheet P/N 526607.

CUSTOMER CARE

If you have any questions concerning the installation of 
this 

R

, please contact your Fisher & Paykel 

Authorized Service Agent.

USA

Fisher & Paykel Appliances

27 Hubble
Irvine
CA 92618

Toll Free 

1 888 9 FNP USA 

 

1 888 9 367 872

www.usa.fisherpaykel.com

Summary of Contents for DishDrawer DD603I Integrated

Page 1: ...Panel to be above the R where required Important The air vent between the Upper and Lower Panels must not be covered An air gap of 5 16 8mm MUST be provided PLEASE NOTE Your model of R may differ from the model shown in the diagrams Diagrams have been simplified to enable clearer instruction FOLLOW THESE INSTRUCTIONS BEFORE REFERRING TO PRODUCT INSTALLATION INSTRUCTION SHEET P N 526607 The Door an...

Page 2: ...OE KICK PANEL INSTALLATION DEPTH When using a rectangular Toe Kick the maximum depth excluding the Toe Kick Panel is 25 8 67mm To move the Toe Kick deeper the Toe Kick Panel must have the profile shown in the diagram below cut out of it The maximum Toe Kick depth with the cut out excluding the Toe Kick Panel is 5 127mm WIDTH OF TOE KICK PANEL Refer to Width of All Panels on page 1 Height of adjace...

Page 3: ... hole center to hole center template is provided on the Mounting Backet WARNING Be sure the Product is not plugged in Important Accuracy is essential when cutting the Badge slot to be sure of a neat fit to hold the Badge REMOVING THE BRACKET 1 To remove the Mounting Brackets withdraw the pins from the Drawer sides using a pair of needle nose pliers 2 Gently slide the Mounting Bracket off in a down...

Page 4: ...per Mounting Bracket on the Upper Panel and the Lower Mounting Bracket on the Lower Panel Important For some materials pilot holes may need to be drilled first before screwing the Mounting Bracket onto the Panel Be sure the drill does not damage the face of the Panel Important The mounting bracket must not be modified in any way It is designed to hold the door front in the correct position to allo...

Page 5: ...he supplied Black Prefinished Toe Kick proceed to Step 6 Grounding the Mounting Brackets and Connecting the Badge Wires Place Toe Kick Panel face down on a soft surface and mark a vertical center line Centralize the plastic Mounting Bracket on top of the Toe Kick Panel Align the top of the Bracket with the top of the Panel Using 5 of the 5 8 16mm screws provided fix the Mounting Bracket to the Toe...

Page 6: ...plied Black Prefinished Toe Kick to the R until the Product is in the cavity Important The gap between doors must be 5 16 8mm or drying problems and moisture damage may occur INTEGRATED PANEL PREPARATION IS COMPLETE The Product is now ready to install Refer to Product Installation Instruction Sheet P N 526607 CUSTOMER CARE If you have any questions concerning the installation of this R please cont...

Page 7: ...own in the diagrams Diagrams have been simplified to enable clearer instruction FOLLOW THESE INSTRUCTIONS BEFORE REFERRING TO PRODUCT INSTALLATION INSTRUCTION SHEET P N 526607 WARNING The air vent between the Panel and the adjacent cabinetry must not be covered An air gap of 3 8 9mm MUST be provided The Door of the can be made to match your kitchen cabinetry This diagram with the addition of your ...

Page 8: ...evel TOOLS NEEDED Safety Glasses Tape Measure Pencil Needle Nose Pliers Drill Phillips Bit or Phillips Screwdriver ø 1 25 4mm Boring Bit or ø 1 25 4mm Hole Saw Small Hand or Jig Saw PARTS SUPPLIED INTEGRATED PARTS KIT part no 526675 Panel Preparation Booklet 1 Panel Mounting Screws 6 Door Front Seal 1 p n 526466 Mounting Bracket 1 p n 526440 Integrated Rectangular Badge 1 Satin Chrome supplied p n...

Page 9: ...oles A hole center to hole center template is provided on the Mounting Backet WARNING Be sure the Product is not plugged in Important Accuracy is essential when cutting the Badge slot to ensure a neat fit to hold the Badge REMOVING THE BRACKET 1 To remove the Mounting Bracket withdraw the pins from the Drawer sides using a pair of needle nose pliers 2 Gently slide the Mounting Bracket off in a dow...

Page 10: ...six of the 5 8 16mm screws supplied secure the Mounting Bracket to each Panel at the six points shown in the diagram NOTE If the the six outermost slots are not able to be used to securely fix the Mounting Brackets to the Panel choose any six well spaced slots about the Panel FITTING THE HANDLE Fit the customer supplied handle WARNING When mounting the handle be sure fastenings do not protrude bey...

Page 11: ...e you are adequately grounded when connecting or disconnecting the Badge by wearing an grounding strap or by grounding yourself to the 5 Plug the green Badge grounding wire onto a Mounting Bracket tab Plug the grounding wire from the Product onto the other Mounting Bracket tab WARNING Be sure the Product is not plugged in Connect the Badge plug to the top of the Badge Isolator Box WARNING The moun...

Page 12: ...The airflow gap between the bottom of the door panel and adjacent cabinetry must be 3 8 9mm or drying problems and moisture damage may occur INTEGRATED PANEL PREPARATION IS COMPLETE The Product is now ready to install Refer to Product Installation Instruction Sheet P N 526607 CUSTOMER CARE www usa fisherpaykel com If you have any questions concerning the installation of this please contact your Fi...

Reviews: