![Fisher & Paykel DCS ADR2-24 Installation Instructions And User Manual Download Page 11](http://html1.mh-extra.com/html/fisher-and-paykel/dcs-adr2-24/dcs-adr2-24_installation-instructions-and-user-manual_2295813011.webp)
9
INSTALLATION
Fig. 5B
Fig. 4B
island cutout
1-9/16" Bottom of center divider to
C
B
A
A
B
E
D
2-5/8”
21-1/2" support
boards must
fit in this area.
Sticker location of
Model, Serial, Code Number
*
SUPPORT BOARD DIMENSIONS
Model A
B
C
D
E
48”
2 X 20” 1-1/2”* 3-1/2” min. 15 12
36”
20”
1-1/2”* 3-1/2” min. 15 –
30”
2 X 20” 1-1/2”* 3-1/2” min. 15 12
24”
20”
1-1/2”* 3-1/2” min. 15 –
To ensure proper drawer operation, be sure
your support boards are flat & level.
*Dependent on application. Top of
support boards must be 1-9/16” above
the bottom edge of the cutout.
Leave a 2” set back for the flush installation.
Fig. 6B
For proper
support & drawer
operation, insure
that support
boards are level
front to back &
side to side.
Support Board (typical)
Support Boards
(typical)
FRONT VIEW (TYPICAL)
END VIEW (TYPICAL)
Summary of Contents for DCS ADR2-24
Page 2: ......
Page 4: ......
Page 17: ...15...
Page 32: ...15 REMARQUE...
Page 33: ...16 REMARQUE...
Page 34: ......
Page 35: ......