background image

3 | Assembly

FISCHER Mess- und Regeltechnik GmbH

8/20

BA_EN_NC57

3 Assembly

3.1 General

 CAUTION

Risks connected to medium or system

The builder or operator of the tank system must implement suitable protective
measures for installation and maintenance work.

3.2 Process connection

• By authorized and qualified specialized personnel only.

• Assembly only with the delivered process connection.

• Note the maximum permissible operating pressure of 10 bar.

• Check that the device is compatible with the medium being measured.

As standard the device comes with a size ½ or 1 thread socket for mounting in
a welding sleeve. The device is suited only for vertical installation and, if pos-
sible, should be mounted at the highest point of the tank.

NOTICE! See also the information about the calibration in the section
"Start-up".

C

A

: Initial capacitance (probe exposed)

C

E

: End capacitance (probe covered)

10 mm

Calibration

C

A

Installation length

E

C

700 mm

Clip

Insulator

Fig. 4: 

Assembly of the NC57

There must be at least 10 mm between the bottom of the tank and the end of
the rod due to the possible formation of sediment or in case the tank needs to
be moved (e.g. tank transportation).

The electrode rod must be mounted in parallel to the tank wall. In the case of in-
stallation lengths > 700 mm, the rod must be supported by insulated circlips at
intervals of 700 mm.

Pulsating impacts on the tank system can cause functional impairments on the
device.

Summary of Contents for NC57

Page 1: ...Operating manual NC57 Capacitive filling level probe 09015282 BA_EN_NC57 Rev ST4 A 09 20 09015282...

Page 2: ...d using electronic systems or any other form print photocopy microfilm or another process without the written consent of the company FISCHER Mess und Regeltechnik GmbH Bad Salzuflen Reproduction for i...

Page 3: ...gram explanation 5 2 Product and functional description 6 2 1 Delivery scope 6 2 2 Device versions 6 2 3 Intended use 7 2 4 Function diagram 7 2 5 Design and mode of operation 7 3 Assembly 8 3 1 Gener...

Page 4: ...standards 1 3 Risks due to Non Observance of Safety Instructions Non observance of these safety instructions the intended use of the device or the limit values given in the technical specifications c...

Page 5: ...ion DANGER Type and source of danger This indicates a direct dangerous situation that could lead to death or serious injury highest danger level 1 Avoid danger by observing the valid safety regulation...

Page 6: ...lank M12 plug NG63 Bayonet ring housing Field housing 4 3 4 3 F D IP65 IP67 Fig 1 Device versions 2 2 1 Type plate This type plate serves as an example of the information that is stated The data shown...

Page 7: ...CE End capacity probe covered RxD Min Max Ub Ub Output brown blue black IR Status LED Probe C Earth connection to the tank Fig 3 Function diagram 2 5 Design and mode of operation The tank wall and spe...

Page 8: ...device is suited only for vertical installation and if pos sible should be mounted at the highest point of the tank NOTICE See also the information about the calibration in the section Start up CA Ini...

Page 9: ...ue Black Coding M12 plug Tank Fig 5 Electrical connections Filling level probe Supply Output signal Input signal Sig Ub Ub Sig Ub Ub C DC AC DC Fig 6 3W connection The permitted operating voltage and...

Page 10: ...1 2 3 5 6 Data transfer Operation saving 4 Fig 7 Calibration For the calibration you need an infrared remote control of type EU04 see ac cessories 1 Remove control EU04 2 Filling level probe 3 MIN but...

Page 11: ...vel is proportional to the filling volume in a cylindrical tank NOTICE This simple ratio no longer applies in the case of complex tank forms Depending on the tank geometry the filling level and tank c...

Page 12: ...The measuring device must be protected against impacts It should be transpor ted in the original packaging or a suitable transport container 5 3 Service All defective or faulty devices should be sent...

Page 13: ...humidity 45 75 Air pressure 86 to 106 kPa 860 to 1060 mbar Installation position vertical 6 2 Input variables Measuring range The measuring range lies between 400 mm and 2000 mm depending on the order...

Page 14: ...esign Electrical connection M12 connector 4 pin male Installation position vertical 6 7 1 Materials Materials of the parts that come into contact with the medium Probe rod bare Stainless steel 1 4404...

Page 15: ...BA_EN_NC57 15 20 6 7 2 Dimension drawings Field housing Bayonet ring housing M12 plug AF41 AF27 72 59 35 Installation length G 8 8 8 coated 8 8 8 coated Installation length 35 59 64 Fig 8 Dimension d...

Page 16: ...ted electrode Casing material connection 2 Code no D Stainless steel 1 4571 wth G connection F Bayonet housing NG63 in stainless steel 1 4301 with G1 connection Installation length from sealing surfac...

Page 17: ...ction cable with M12 connector 4 poles 2 m 06401994 Connection cable with M12 connector 4 poles 5 m 06401563 Connection cable with M12 connector 4 poles 7 m 06401572 Connection cable with M12 connecto...

Page 18: ...8 Attachment FISCHER Mess und Regeltechnik GmbH 18 20 BA_EN_NC57 8 Attachment Fig 10 CE_DE_NC57...

Page 19: ...FISCHER Mess und Regeltechnik GmbH BA_EN_NC57 19 20 Notes...

Page 20: ...lefelder Str 37a D 32107 Bad Salzuflen Tel 49 5222 974 0 Fax 49 5222 7170 www fischermesstechnik de info fischermesstechnik de Technische nderungen vorbehalten Subject to technical changes Sous r serv...

Reviews: