4 | Start-up
FISCHER Mess- und Regeltechnik GmbH
10/20
BA_EN_NC57
4 Start-up
4.1 General
All electrical lines must have been installed properly before the start-up takes
place. All connections must be arranged so that there are no mechanical forces
acting on the device.
• Check that the defined safety measures for tank systems have been ob-
served.
• Check that the mechanical installation is correct in accordance with the ap-
plicable erection regulations for tank systems.
• Make sure that the device is protected from the effects of frost.
• Switch the supply voltage on. A small light diode flashes regularly and
briefly as a function control.
• This completes the start-up.
NOTICE! The probe was calibrated to the ordered installation dimension.
An on-site calibration is therefore unnecessary.
If for some reason a recalibration does become necessary, proceed as de-
scribed below.
4.2 Calibration
1
2
3
5
6
Data transfer
Operation/saving
4
Fig. 7:
Calibration
For the calibration, you need an infrared remote control of type EU04 (see ac-
cessories).
1
Remove control EU04
2
Filling level probe
3
MIN button
4
MAX button
5
Status LED
6
Infrared receiver LED
The calibration takes place in two stages:
1. Minimum filling level
w
Zero point calibration
1. Reduce the level in the tank to the lowest filling level.
2. Press and hold the "
MIN
" button.
Ê
The status LED flashes quickly. After 2 to 3 seconds, the LED lights up
permanently. This is how the device indicates that the zero point has
been stored.
3. Now release the button.
u
The zero point has been calibrated.
2. Maximum filling level
w
Calibration of the measurement range (end value)
1. Fill the tank to the highest filling level.
2. Press and hold the "
MAX
" button on the infrared remote control.
Ê
The status LED flashes quickly. After 2 to 3 seconds, the LED lights up
permanently. This is how the device indicates that the end value has
been stored.
3. Now release the button.
u
The end value has been calibrated.
u