![FIRST TEAM SPORTS Jam Series Assembly Instructions Download Page 1](http://html1.mh-extra.com/html/first-team-sports/jam-series/jam-series_assembly-instructions_2293873001.webp)
FIRST TEAM SPORTS, INC
Jam Series Assembly Instructions
Bill of Materials
A (1) Vertical Post
H (1) Crank Bracket
O (8)
½
” Nylon Flatwasher
B (2) Short Extension Arm
I (1)
½
” x 7
½
” Hex Bolt
P (2) Lift Spring
C (2) Long Extension Arm
J (5)
½
” x 11” Hex Bolt
Q (2) Yoke Spacers
D (1) Extension Arm Support
K (6)
½
” Locknut
R (1) Rim Height Indicator
E (1) I-Frame Backboard Mnt.
L (3)
½
” x 4” U-Bolt
S (1) Rim Height Stickers
F (1) 4” Square Post Cap
M (6)
½
” Lockwasher
T (1) Nylon Cable Tie
G (1) Crank Assembly
N (6)
½
” Hex Nut
NOTE: Immediately unpack all components and cross check against bill of materials. Report any
shortages to First Team customer service at 1-888-884-6677.
1. Locate and dig a 12” minimum diameter x 36” deep hole.
2. Fill hole with wet premixed concrete, insert vertical pole leaving 108” above desired playing surface.