FIRST TEAM SPORTS Jam Series Assembly Instructions Download Page 1

FIRST TEAM SPORTS, INC
Jam Series Assembly Instructions

Bill of Materials

A (1) Vertical Post 

H (1) Crank Bracket

O (8) 

½

” Nylon Flatwasher

B (2) Short Extension Arm

I (1) 

½

” x 7

½

” Hex Bolt 

P (2) Lift Spring

C (2) Long Extension Arm

J (5) 

½

” x 11” Hex Bolt 

Q (2) Yoke Spacers

D (1) Extension Arm Support

K (6) 

½

” Locknut

R (1) Rim Height Indicator

E (1) I-Frame Backboard  Mnt.

L (3) 

½

” x 4” U-Bolt

S (1) Rim Height Stickers

 

F (1) 4” Square Post Cap 

M (6) 

½

” Lockwasher

T (1) Nylon Cable Tie

G (1) Crank Assembly

N (6) 

½

” Hex Nut

 

NOTE: Immediately unpack all components and cross check against bill of materials. Report any
shortages to First Team customer service at 1-888-884-6677.

1. Locate and dig a 12” minimum diameter x 36” deep hole.

2. Fill hole with wet premixed concrete, insert vertical pole leaving 108” above desired playing surface. 

Reviews: