
HE-PP-12
HEC-3
HE-SSR-0.0
HE-L
CB
Swivel
Connector
Connect the customer's power supply cable (after ensuring the power is off and secured against switching
back on) into the high-energy ignition unit, connect the wires for ignition monitoring and supply power to
the unit.
Switching on the power will immediately generate 4-5 ignition sparks per second. The transition of the igni-
tion spark can be seen through the built-in inspection window. The ignition spark monitoring relay switches
simultaneously.
A functioning ignition system consists of the following individual components:
HE-PP-12-QD
High-energy power pack unit, quick disconnect version
HEC-X-QD
High-energy cable in metal protection sleeve (with PE and high tension conduc-
tor), with connectors on both ends. Length 3 m or 5 m
X
indicates the length: e.g. HEC-3-QD for 3 m
CB-QD
Connection box with quick disconnect
HE-SSR-0.0
Tip Adapter for ignition tip (length 325 mm)
HE-S or HE-L
High energy ignition tip HE-S (length 200mm) or HE-L (length 675m)
ET 0.5 and/or ET1.0
Stainless Steel Extension Tubes 0.5m and/or 1.0m long, if
required. In addition, the safety instructions on page 4 must also be respected, as a minimum.
The power supply cable must be provided by the customer and is not included in the delivery, but can be
offered upon request.
Carefully read through the whole of this page before first use and observe the information on page 15:
Due to the use of the high-voltage plug, the high-energy ignition unit is pre-wired.
On the external PE connection (protective earth) of the high-energy supply unit, a cable with a minimum
cross-section of 4 mm
2
must be connected to the earth potential point of the burner (see the assembly
instruction below).
8mm of the insulation of the PE wire must be removed to allow the supplied yellow ring terminal to be
attached, using the appropriate crimping pliers (specifically designed for insulated self-locking crimped on
terminals). The self-locking feature ensures, by engaging at the endpoint, that the maximum available con-
tact is achieved.
This ensures that the full contact is available to provide maximum earth potential, allowing the system to
function correctly. The yellow ring terminal is applied to the external earthing bolt on the casing with a plain
washer first, then the ring terminal, followed by the serrated lock washer and finally the nut.
FIGURE 3.
Ignition electrode and ignition unit in kit form (HE-Kit)
Consists of: Power pack HE-PP-12 / HEC-3 / Tip adapter HE-SSR-0.0 / Tip Long HE-L, connection
box CB and swivel connector
8