background image

 

 

 

The installer is responsible for adequate protection of the fire pump controller components against metallic 
debris or drilling chips. Failure to do so may cause injuries to personnel, damage the controller and 
subsequently void warranty. 

 

Energy Consumption 

Standby power: 10W 

 

Sizing 

Incoming power terminals on the controller are suitable to accept wire based on that selection with insulation not less 
than 60°C. (Refer to terminal diagram for terminal sizes.) 
The electrical wiring between the fire pump controller and the pump motor shall be in rigid, intermediate, or liquid 
tight flexible metal conduit or Type MI cable and meet the requirements of NFPA 70 National Electrical Code or other 
local codes. 
The number of conductors required varies depending on the model of starter: 
 3-wires plus ground sized at 125% of full load current for models FTA1000, FTA1800, FTA1930 and FTA1500. 
 6-wires plus ground sized at 125% of 50% of the motor full load current for FTA1250 model. 
 6-wires plus ground sized at 125% of 58% of the motor full load current for FTA1300 and FTA1350 models. 
 

Incoming Power Connections 

Incoming normal power is to be connected to terminals located on the disconnecting means IS. 
- For 3 phases motor: identified L1-L2 and L3.  
- For single phase motor: identified L1 and L3 
 

Motor Connections 

Motor wires shall be connected to terminals identified by:  
- T1-T2 and T3 located on main contactor (1M) for models FTA1000, FTA1800, FTA1930 and FTA1500 
- T1-T2 and T3 located on contactor (1M) and T7-T8 and T9 located on contactor (2M) for model FTA1250 
- T1-T2 and T3 located on contactor (1M) and T6-T4 and T5 located on contactor (2M) for models FTA1300 and 
FTA1350 
It is the responsibility of the installer to obtain connection information on the motor and to assure that the motor is 
connected as per the motor manufacturer recommendations. Failure to do so may cause injuries to personnel, 
damage the motor and/or the controller and subsequently void warranty on both items. 
 

Terminal Strip Descriptions 

Electric IO Board 

For full terminal strip description consult full manual. 

 

Summary of Contents for FTA1000 Series

Page 1: ...1 INSTALLATION AND MAINTENANCE GUIDE FOR MARKIII ELECTRIC FIRE PUMP CONTROLLERS MODEL SERIES FTA740 FTA750 FTA1000 FTA1250 FTA1300 FTA1350 FTA1500 FTA1800 FTA1930...

Page 2: ...utomatically on low pressure detection by the pressure sensor when the pressure drops below the cut in threshold MANUAL START The motor can be started by pressing the START push button regardless of t...

Page 3: ...en tested in accordance with the ICC ES AC156 IBC 2015 CBC 2016 OSHPD Special Seismic Certification Preapproval OSP and ASCE 7 10 Chapter 13 standards Proper installation anchoring and mounting is req...

Page 4: ...ing has been provided Controllers must be installed inside a building and they are not designed for outside environment The paint color may change if the controller is exposed to ultraviolet rays for...

Page 5: ...or full load current for FTA1250 model 6 wires plus ground sized at 125 of 58 of the motor full load current for FTA1300 and FTA1350 models Incoming Power Connections Incoming normal power is to be co...

Page 6: ...ng label is the most important label It must be read carefully to ensure the compatibility between the controller and the installation Verify that the controller is installed securely on the wall or o...

Page 7: ...he panel all in accordance with the specifications in order to minimize interference with other equipment Verify and or install the proper water connections for the water input and the drain They must...

Page 8: ...on then put the circuit breaker disconnecting means in ON position Verify the readings on the controller main screen Once the controller has booted up the First Start Up page appears The controller wi...

Page 9: ...2 L3 and L1 L3 nominal is the same as what is written on the fire pump controllers nameplate The fire pump controller will validate the nominal voltage automatically versus what it has been built for...

Page 10: ...the motor is turning in the right direction by checking the Check on Normal Power selector box Once the motor rotation has been checked go back to the controller start up page and press the Verify pre...

Page 11: ...r system specifications Cut Out value will default to Cut In plus 10 PSI To manually enter the cut out select the check box beside it and enter the desired value optional When finished press the Servi...

Page 12: ...12 From the Home page verify that the displayed values are correct The First Start up is now completed The controller is fully installed and configured...

Page 13: ...years of service the Mark III battery may become less efficient and could lose the time after a shutdown Alarm Buzzer The alarm buzzer is activated under default faulty conditions stated by the NFPA20...

Page 14: ...seconds 4 Turn ON all disconnecting means Pressure Transducer Test The controller will test the pressure transducer at least once a week if no manual run test or no weekly test has been conducted Dur...

Page 15: ...nd the set points Screen Saver After 5 minutes of inactivity on the Mark III the screen will dim it s brightness to 25 After 10 minutes of inactivity on the Mark III the Black Screen screen saver will...

Page 16: ...rvice Statistics and Last Service Statistics pages Download This button leads to the Download page which allows the user to download information including the user manual drawings logs statistics and...

Page 17: ...and Cut In can be set on this page It is possible to install a custom Service card on this page Contact Firetrol for more information Pressing on the question mark on the Mark III will redirect to th...

Page 18: ...18 Firetrol Inc 1 919 460 5200 3412 Apex Peakway Apex NC 27502...

Reviews: