3
Before you permanently install
Before you install a HotPort 5020-LNK solution in a permanent location, you
need to make sure you have the correct components and make sure the
components are operational.
Preparing what you need to install
To get what you need to set up the solution:
1.
Open the box.
2.
Remove the contents.
3.
Check the contents for damage. See “Box contents for a HotPort 5020-LNK
solution.”
If a part is missing or damaged, call your Firetide reseller.
4.
If the contents are good and correct, keep the box for future use.
Box contents for a HotPort 5020-LNK solution
The HotPort 5020-LNK solution box contains these items:
•
Two HotPort 5020-LNK nodes with assembled mount brackets
•
Two AP20-050-MIMO-19 antennas with mount hardware
•
Two integrated 3x3 antenna cables
•
Two staging antennas
•
Two RP-SMA to type N adapters
•
Two mount brackets for 3.7 to 5.0 cm (1.5 to 2.0 inch) diameter poles or a
wall
•
Two mount kits
-
U-bolts, M6x1.0-80mm, with flat washers, split washers, nuts
-
Claw-tooth pole grippers
-
M6x1.0-40mm hex bolt
-
M6x1.0-20mm hex bolt
-
Hex-head socket wrench
•
Two 802.3at Power over Ethernet (PoE) injectors
•
Two DC power connectors (field installable)
•
Two weatherized Ethernet RJ-45 connectors (field installable)
•
Two Cat 6 Ethernet cables, 1 meter (3 feet)
Note.
Other IEC cords are available separately.
Summary of Contents for HotPort 5020-LNK
Page 1: ...HotPort FiretideInstallationGuide HotPort 5020 LNK Nodes Published March 2014 Revised 2016...
Page 8: ...HotPort5020point to pointsolution 2...
Page 16: ...Beforeyoupermanentlyinstall 10...
Page 32: ...HotPort 5020 LNK node installation 26...
Page 39: ...Troubleshooting 33 8 RemovetheEthernetcable...
Page 40: ...Troubleshooting 34...