FIRESIDELODGEFURNITURE.COM | 877-568-6188
4
7. This step applies ONLY to Single/Single, Double/Double, and Queen/Queen bunk beds
a. These beds come with 2 secondary bed rails. These secondary bed rails are not quartered out
(no right angle cut in). The mortises are located on the main post, above the bed rail mortises.
b. The secondary bed rails should be placed into mortises so the small end of the secondary rail is
directly above the large end of the bed rail.
8. Screw in a 6” lag screw/washers from the backside of headboard into the Log Side Rails about 3/4 of the way.
(Do not tighten completely at this time). Hint: Scraping the lag screw accross a bar of soap or wax will make it
easier to install the screw.
9. Insert the other end of Log Side Rails into 2 1/2” mortises of footboard. Screw the lag screw in about ¾ of the
way. (Do not tighten completely at this time).
10. If you have a King or Queen Size Bed, assemble the T-Support (consists of qty 2 approximately 7”x75” boards
and 1 has a slot) – stand the other upright in the slot and screw together – approx height will be 8.25”. Lay
assembled T-Support on the floor in the center of the bed running from head to foot and centered between the
two side rails.
11. Lay all 5 slats onto wide flat portion of the Log Side Rails. Secure the slats with the screws provided
(1 screw on each end is sufficient.) Do not over-tighten the screws as this will cause the slats to split.