Mounting
Semi-flush Mount Backbox
19
Document 53244 Rev. A 03/14/08 P/N 53244:A
3.2
Semi-flush Mount Backbox
Mounting in SBB-3 Three Gang Electrical Box
Remove the plug-in terminal blocks from the LCD-80FC circuit board.
Connect the EIA-485 and power wiring into the terminal block positions
illustrated in Figure 1-2 on page 9, Figure 4-1 on page 22 and Figure 4-
2 on page 23. Plug the terminal blocks back into the P2 and P1 connec-
tors on the back of the indicator. Set DIP switch SW1 for the desired
options. Refer to Figure 1-4 on page 13.
Carefully insert the LCD-80FC into the three-gang electrical box P/N:
10103 or three electrical boxes ganged together and attach it using the
four mounting holes on the LCD-80FC flange and the four screws
provided for this purpose. Replace the trim ring and secure with the two
screws which were previously loosened. Adjust the plastic trim ring to
the surface of the wall before tightening the screws.
Do not overtighten.
Figure 3-3: Mounting in SBB-3 Box
LCD-80FC flange
3-gang electrical box P/N 10103
Three-gang electrical box P/N 10103
flange
EIA-485 and power wiring
LCD80fl
g
.c
dr
1010
3box
.c
dr
Lc
d40
box
.cd
r
The LCD-80FC can be semi-flush mounted in a
three-gang electrical box, P/N 10103 or equiva-
lent, with a minimum depth of 2 3/16". The
LCD-80FC can also be mounted in three gang-
able electrical switch boxes connected together
as illustrated in Figure 3-4 on page 20.
mounting holes (4)
Important!
When installing conduit in a 3-gang
electrical box, use knockouts on the top or bot-
tom. Installing conduit on the sides or back of
some boxes may interfere with mounting of the
LCD-80FC in the box.