HOW TO START AND USE THE MACHINE
S32B
Revision 00 Maggio 2006
Page 28 di 37
The machine must be handled with proper devices as stated in the scheme below. Please, make sure that
the black arrow on the package is always in the middle of the elevator forks or the sling bands.
Anchorage and/or sling points are set on the machine up in order to keep the stability of the sweeper during
the handling.
PACKAGE
HANDLING EQUIPMENT
PICTURE
Paperboard or plywood box
on a pallet
Fork elevator
N° 17
None
Fork elevator or crane truck with a two-band-sling and
equalizer
N° 18
LOADING SYSTEM
Picture 21
Picture 22
Make reference to § 2.3. for the dimensions and the weight of the machine.
Trained personnel only can handle the machine.
The bands used to lift the machine up must have the same loading capacity as the
machine load. Handling operations must be done without causing a loss of
stability of the machine. Otherwise, the machine can be damaged or the operator
can de in danger.