background image

TBP SERIES PUMPS

OPERATION & PARTS MANUAL

P/N 108100 R7

Summary of Contents for TBP 27

Page 1: ...TBP SERIES PUMPS OPERATION PARTS MANUAL P N 108100 R7 ...

Page 2: ...claration is valid provided that the devices are fully assembled and no modifications are made to these devices Type of Device Drum and Container Pump Tubes and Accessories Models EU Directives Machinery Safety 2006 42 EC Applied Harmonized Standards EN ISO 12100 EN 809 Manufacturer Finish Thompson Inc 921 Greengarden Road Erie Pennsylvania 16501 1591 U S A Signed _ President 25 March 2020 Person ...

Page 3: ...hompson Inc shall not be held responsible for any damages to people or prop erty In case of doubt or enquiries please reply to our Technical Service department directly at the following address Finish Thompson Inc 921 Greengarden Rd Erie PA 16501 U S A Tel 1 814 455 4478 Fax 1 814 455 8518 www finishthompson com fti finishthompson com Index Introduction 3 Warranty General Terms Conditions 4 Safety...

Page 4: ...sembling with new or repaired parts free of charge delivered by Finish Thompson Inc Parts subjected to normal wear and tear shall not be covered by the warranty Finish Thompson Inc shall decide as to whether the defective or faulty part shall be replaced or repaired Transportation charges are prepaid to Finish Thompson 4 The warranty of the products shall be valid for a period of 12 months from th...

Page 5: ...onger than 1 minute ALWAYS use and store the pump and motor in an upright position NEVER use in pressurized containers ALWAYS use a chemically compatible hose rated for the temperature of the product being pumped ALWAYS tighten and torque a stainless steel hose clamp to 25 in lbs 2 8 N m ALWAYS check the pump for leaks on a regular basis If leaks are noticed the pump must be repaired or replaced i...

Page 6: ...dommages matériels ou corporels causés par une utilisation inappropriée de l équipement AVERTISSEMENT Il est de la responsabilité de l utilisateur de faire fonctionner la pompe conformément aux règles OSHA Santé et Sécurité au Travail relatives à la distribution de liquides Les conteneurs de pompes doivent être électriquement mis à la terre lors de l utilisation de liquides inflammables ou combust...

Page 7: ...ter Tube Diameter 1 66 4 2 cm Discharge Thread 1 hose barb Max Specific Gravity 1 4 Max Viscosity 200 cP Min Max Fluid Temperature 35 F Min to 150 F Max 1 6 C Min to 66 C Max Wetted Materials Pure polypropylene pure PVDF PTFE Alloy 625 ...

Page 8: ... on the pump tube and is in the off position See motor instruction manual for installation instructions 2 Insert the pump tube into the fluid to be dispensed and the hose into the container to be filled prior to starting the pump Bung adapters are available to provide a tighter fit between the pump tube and bung opening of a standard drum Check drum pump accessories at www finishthompson com or co...

Page 9: ... into the pump head item 5 by threading it counterclockwise left hand threads 2 Insert the pump shaft assembly up through the bottom of the intake tube until the threaded part of the shaft sticks out slightly from the pump head 3 Warm up the seal assembly item 4 with a heat lamp or by soaking it in hot water to aid in the installation process 4 Slide the seal over the shaft threads and onto the sh...

Page 10: ...10 TBP SPARE PARTS EXPLODED VIEW ...

Page 11: ...E M102221 2 48 PURE POLYPROPYLENE M102221 3 7 1 IMPELLER ASSEMBLY PTFE WITH ALLOY 625 PIN A103190 8 1 SPACER SET 27 PURE POLYPROPYLENE A103189 1 40 PURE POLYPROPYLENE A103189 2 48 PURE POLYPROPYLENE A103189 3 9 2 CENTER BEARING PTFE M100039 1 10 1 SHAFT 27 ALLOY 625 M102219 1 40 ALLOY 625 M102219 2 48 ALLOY 625 M102219 3 11 1 COMPRESSOR PTFE WITH ALLOY 625 PIN A103191 12 1 DISCHARGE O RING FKM J10...

Page 12: ...Service 1 800 888 3743 P N 108100 REV 7 3 27 2020 ...

Reviews: