8
4. Taking the side of the drain clamp with the QC fitting, stick the self-
adhesive sponge provided to the inside of the drain clamp (remove
centre piece of sponge beforehand). Place one half of the plastic clamp
on either side of the drain pipe with, and clamp loosely using the nuts
and bolts included.
5. Align hole on drain clamp with drilled hole. A drill bit (or pen/pencil)
may be used to help with alignment. Once aligned, tighten clamp with
Phillips screwdriver.
Avoid over-tightening clamp.
6. Determine length of tubing needed for connection from RO system
to drain clamp and cut to length. Push tubing into fitting on clamp and
insert blue collet clip under collet. Pull the tubing back to check seal is
secure.
Assemble main RO system
7. Remove all packaging and plastic wrapping/seals from filters.
Do
not include the membrane in this step.
Connect housings to RO system by hand and then use spanner
provided to completely tighten. From right to left (closest to inlet):
-
Sediment 5-micron pre-filter in 1
st
stage housing
-
Carbon block filter in 2
nd
stage housing
Connect system
Determine length of tubing needed between RO system and mains
water supply and remove red stopper on unit. Connect tubing from
cold water supply, drain clamp and water outlet to RO system by
removing the coloured stoppers and inserting tubing into the
connections listed below:
Mark 1 (Red stopper)
– Cold water supply to RO system
Mark 2 (Black stopper)
– Waste water to drain
Mark 3 (Blue stopper)
– Last stage on RO system to water outlet
Do not remove yellow stopper
.
Check all tubing is secure by pulling back on tubing, remembering to
always remove collet clips before inserting tubing.