INSTALLATION
2
Packing and unpacking
The machine will come packaged in
a carton with foamed polyester
inserts to guarantee perfect safety
during transport.
•
Handle the carton in compliance
with the instructions.
•
Remove
screws
A
and lift
machine from pallet.
•
Remove
bars
B
.
•
Open the carton and make sure
that all components are intact.
Keep the carton for any future
machine removal.
•
Lift the machine according to the
instructions and place it in its
selected setting for installation.
Installation area
The selected machine work setting must be sufficiently lit and have an electric power outlet. The worktop must be
sufficiently large, perfectly level and dry. The machine should be installed in non-explosive environments. In any
case, installation should be carried out by taking into account any applicable industrial safety regulations in force.
Environmental Condition Table
Descriptions Values
Working temperature
0÷35 °C (32÷95 °F)
Storage temperature
-15 to +65 °C (from –6.8 to +149 °F)
Relative humidity
Maximum 80% at an ambient temperature of 20 °C
Maximum 50% at an ambient temperature of 20÷60 °C
Ambient dust
Lower than 0.03 g/m³
Electric connection
DANGER – CAUTION: Electric connection to the power
mains should be executed by skilled engineers.
Single-phase Three-phase
Connection connection
230V – 1Ph 230/400V – 3Ph
Check for the perfect effeciency of the plant grounding system. Make sure
that the line voltage
(V)
and frequency
(Hz)
correspond to the machine
ratings (refer to the machine identification plate and wiring diagram). The
machine comes equipped with an electric cable to which a multipolar plug
should be connected. Plug the machine into a main wall switch with
differential.
Three-phase connection
Start the machine for just a few seconds and check that the beater turns in
the right direction. If this is not the case, disconnect power and exchange
two of the three phase wires in the plug.