![Fimap GENIE E Use And Maintenance Manual Download Page 9](http://html1.mh-extra.com/html/fimap/genie-e/genie-e_use-and-maintenance-manual_2288979009.webp)
9
PREPARATION OF MACHINE
5. INSTRUMENT PANEL COMPONENTS
The instrument panel components are identified as follows:
1.
Main switch (1)
2.
Suction switch (2)
3.
Solenoid valve switch (3)
6. FIXING THE HANDLEBARS
For packaging purposes the handlebars are supplied folded; they must now be put in the working
position. Proceed as follows:
1.
raise the handlebars by pulling the lever - indicated by the arrow - upwards
2.
place the machine in the working position
7. SOLUTION
TANK
The recovery tank must be completely empty each time the solution tank is filled.
Verify that the cap is correctly inserted in its housing (A).
Verify that the quick connection is correctly connected (B).
8. DETERGENT
SOLUTION
Proceed as follows to fill the solution tank:
1.
Make sure that the recovery tank is empty
2.
Make sure that the main switch is off
3.
Remove the inlet cap located on the right rear side of the machine.
4.
Fill it with clean water at a temperature not exceeding 50
C.
Add the liquid detergent to the tank in the concentration and manner indicated on the detergent
manufacturer's label. The formation of excess foam could damage the vacuum motor, so use only the
minimum amount of detergent that is necessary.
Summary of Contents for GENIE E
Page 1: ...USE AND MAINTENANCE MANUAL GENIE E ED 09 2019 ENG ORIGINAL INSTRUCTIONS Doc 10004515 Ver AC...
Page 22: ...22...
Page 23: ......