![Fimap GENIE E Use And Maintenance Manual Download Page 8](http://html1.mh-extra.com/html/fimap/genie-e/genie-e_use-and-maintenance-manual_2288979008.webp)
8
A
C
B
MACHINE PREPARATION
1. HANDLING THE PACKED MACHINE
The machine is contained within specific packaging.
Every pallet consists of four machines arranged on two levels.
It is not possible to place more than two packages on top of each other.
The overall mass for a single package is 42 kg.
The overall dimensions of the package are:
A: 500
mm
B: 500
mm
C: 1150
mm
2. HOW TO UNPACK THE MACHINE
1.
Open the packaging on the side indicated.
2.
Extract the machine from its packaging.
3. HANDLING AND TRANSPORTATION OF THE UNPACKED MACHINE
Genie E is a machine that can be managed in all situations and transported without effort, even in small
vehicles.
Just lift the front part, using the machine handlebars as a lever. The big rear wheels mean it can be
towed anywhere and loaded on a truck by means of a simple ramp.
Genie E is easy to transport even by car. Exploiting the full flexibility of the handlebars, you can fold it
up (see the handlebars fixing section) and, with the help of a colleague, place it in the boot of the car
without disassembling any components.
4. CONNECTING THE MACHINE
For the connection, you must:
1.
Connect the extension lead (not supplied) to the plug on the handlebar.
2.
block the extension lead to the cable-holder handle (2) in front of the handlebars
3.
connect the extension lead to the wall socket
ATTENTION: before connecting the extension lead to the socket, check
the switches are in the off (“0”) position!
Summary of Contents for GENIE E
Page 1: ...USE AND MAINTENANCE MANUAL GENIE E ED 09 2019 ENG ORIGINAL INSTRUCTIONS Doc 10004515 Ver AC...
Page 22: ...22...
Page 23: ......