9
PREPARATION OF THE MACHINE
4.
INSTALLING THE BATTERY (BATTERY OPERATED MACHINE ONLY)
We recommend, in order to have good operating autonomy, installing a 12Vx140Ah/20h battery.
Make sure that the battery is charged before installing.
ATTENTION: carefully follow the battery constructor or distributor’s
instructions for the maintenance, the first charge and the daily recharging.
Professionals must carry out all the installing and maintenance procedures.
Installation instructions:
•
Turn push-button (d) to off.
•
Open the machine cover
•
Put the battery in its compartment.
•
Connect the positive and negative connections as shown in the figure.
•
Close the cover.
To remove the battery please follow the above mentioned instructions in reverse
5.
CONNECTING BATTERY CHARGER
Under the bonnet you find the connector where the battery charger connectors shall be connected.
The coupling connector is delivered in the bag together with this instruction manual and it should be
mounted on the battery charger cables, paying attention to polarity.
6.
BATTERY RECHARGING
To avoid permanent damage to the batteries, do not ever allow them to run down completely and
recharge them within few minutes after the battery indicator, (e) starts flashing.
ATTENTION: To remove the battery please follow the above mentioned
instructions in reverse .
ATTENTION: Do not ever allow batteries to run completely down, even
when the machine is not used. During recharging check the electrolyte
level and add distilled water, if necessary.
ATTENTION: Do not ever allow batteries to run completely down, even
when the machine is not used. During recharging check the electrolyte
level and add distilled water, if necessary.